Region 4A -Metal Roofing Prices

METAL ROOFING
Region IV-A
Material Description Unit  Ave. Price (Php)
Corrugated Roofing, Gauge 26 (0.51mm x 2.44mm) sqm                  261.90
Pre-painted Metal Roofing Sheet Ga. 26 Long Span sqm                  359.51
Pre-painted Metal Roofing Sheet Ga. 26 x 2.44m sqm                  330.58
Pre-painted Gutter, GA 24(0.701mm) x 2.44m lnm                  162.14
Ordinary Gutter, GA 24(0.701mm) x 2.44m lnm                  100.43
Pre-painted Flashing, GA 24(0.701mm) x 2.44m) lnm                  163.77
Ordinary Flashing, GA 24(0.701mm) x 2.44m) lnm                    96.59
Pre-painted Ridge Roll, GA 24(0.701mm) x 2.44m) lnm                  164.58
Ordinary Ridge Roll, GA 24(0.701mm) x 2.44m) lnm                    96.59
Roof Ventilators lnm               1,269.79

To see all the material prices we have posted click here.

Please let us know how this blog helped you by subscribing, hitting like or share!

Slope Stabilization Mesh System Prices

Slope Stabilization Mesh System
Description Unit Price (Php)
3mm Ø High Tensile Wire mesh (3.5x30mm) sq.m 6,992.00
10mm Ø Tensile Rope Anchor ln.m 1,012.00
4mm Ø High Tensile Wire Clips pc 138.00
10mm Ø Tensile Wire Rope Anchor pc 4,600.00
Anchor Bolt (32mmØ x 2.5m) pc 966.00
Threading of Bolts w/ nuts pc 1,288.00
Non-Shrink Grout bags 552.00
Centralizer pc 230.00
Drill Bit pc 18,400.00
Centrosema Seeds kgs. 294.40
Enzyme ltrs. 13.80
3D Geonet sq.m 598.00

To see all the material prices we have posted click here.

Please let us know how this blog helped you by subscribing, hitting like or share!

Region 10 – Metal Structure Prices

METAL STRUCTURES
Region X
Material Description Unit  Ave. Price (Php)
Milled Steel Plates Checked FY36 kg                    62.73
Milled Steel Plates FY36 kg                    61.44
Steel Sheet Stainless kg                  197.68
Bridge Rollers and Rockers pc               4,666.55
Pins and Pin Holes FY60 kg                    81.02
Sliding Bearing pc               4,709.93
Structural Steel Angular Bar (A36) kg                    70.24
Structural Steel Channel Bar (A36) kg                    69.62
Structural Steel Square Bar (A36) kg                    69.91
Structural Steel I-Beam (A36) kg                    71.57
Strutural Steel Wide Flange (A36) kg                    69.91
Rivets High Tension kg                  157.29
Washers high Tension kg                  159.10
Cork Expansion Joint Filler (.019m x 1.2m x 2.44m) pc                  609.98
Bolts High Tension kg                  170.72

To see all the material prices we have posted click here.

Please let us know how this blog helped you by subscribing, hitting like or share!

RCP and RMC Price List in the Philippines

Prices updated as of the year 2019.

Reinforced Concrete Pipe Prices
RCP 1500mm x 1m pc          7,131.10
RCP 1370mm x 1m pc          5,872.61
RCP 1200mm x 1m pc          4,725.21
RCP 1050mm x 1m pc          3,729.37
RCP 910mm x 1m pc          2,876.10
RCP 750mm x 1m pc          2,209.46
RCP 600mm x 1m pc          1,467.63
RCP 450mm x 1m pc          1,009.93
RCP 375mm x 1m pc              758.23
RCP 300mm x 1m pc              639.50
Ready Mixed Concrete Prices
RMC 3000psi – 28 Days cu.m          4,543.96
RMC 3000psi – 14 Days cu.m          4,843.43
RMC 3000psi – 7 Days cu.m          5,066.85
RMC 3500psi – 28 Days cu.m          4,858.83
RMC 3500psi – 14 Days cu.m          5,090.93
RMC 3500psi – 7 Days cu.m          5,403.86
RMC 4000psi – 28 Days cu.m          5,178.54
RMC 4000psi – 14 Days cu.m          5,464.10
RMC 5000psi – 28 Days cu.m          5,690.44

These are just average prices. All amount in Php. Normally, RMC and RCP suppliers give clients huge discounts (10-20% off) if bought in bulk. I am listing down all suppliers list and hope to share them here in a bit. VAT Exclusive.

To see all the material prices we have posted click here.

Please let us know how this blog helped you by subscribing, hitting like or share!

 

Price Guide to Basic Hardscape Works

Price guide to simple hardscaping works. Security, project management, temporary facility and control, and as-built preparation are not included as it vary per location.

Product and Execution Requirements
Description QTY Unit  Amount (Php) 
Product Storage and Handling (Contractor’s Temporary Warehouse) 1 lot           20,000.00
Construction Layout and Surveying 1 lot           20,000.00
Local Business Permit 1 lot           20,000.00
Cleaning 1 lot           20,000.00
Description QTY Unit Material (Php) Labor (Php)
Dampproofing  and Waterproofing
Cementitious and Reactive Waterproofing 1 SQ.M.                690.00        200.00
Colorless Floor Hardener 1 SQ.M.                135.00           56.25
Tiles, Stampcrete and Accessories
Supply, Delivery and Installation of Granite (150mm x 150mm) 1 SQ.M.             3,450.00     1,800.00
Supply, Delivery and Installation of Granite (300mm x 600mm) 1 SQ.M.             4,300.00     1,800.00
Supply, Delivery and Installation of #10 Crushed Granite (Washout) 1 SQ.M.             3,290.00        350.00
Supply, Delivery and Installation of Homogeneous Tiles (600mm x 600mm) 1 SQ.M.             1,515.00        350.00
Supply, Delivery and Installation of Homogeneous Tiles (300mm x 300mm) 1 SQ.M.             1,525.00        350.00
Supply, Delivery and Installation of 150mm Wide Stampcrete 1 SQ.M.             1,950.00        300.00
Supply, Delivery and Installation of Stampcrete 1 SQ.M.             1,950.00        300.00
Lighting Accessories
Supply, Delivery and Installation of Recessed Steplight (15W Die Cast Aluminum with Front Panels) 1 pc             6,900.00     3,800.00

Performance, Surety and Guarantee Bonds are also not included.

Looking for per square meter area materials breakdown of tiling works? check this post.

To see all the material prices we have posted click here.

Please let us know how this blog helped you by subscribing, hitting like or share!

Guide to Cement and Aggregates Factors per Concrete Class Mixture

Handy guide on factors to multiply per cubic on different concrete class mixtures. Just multiply each factor to the total volume (in cubic meter) and you’ll get the needed amount of cement (40Kg/bag), sand (cu.m.) and gravel (cu.m.).

Class C (2,000 psi)
Cement 5.634 Bags
Sand 0.4794 cu.m.
Gravel 0.898 cu.m.
Class B (2,500 psi)
Cement 7.399 Bags
Sand 0.486 cu.m.
Gravel 0.8856 cu.m.
Class A (3,500 psi)
Cement 8.799 Bags
Sand 0.5724 cu.m.
Gravel 0.856 cu.m.
Class AA (4,000 psi)
Cement 11.729 Bags
Sand 0.475 cu.m.
Gravel 0.8344 cu.m.

The following factors were already added an average wastage add-ons of around 5% to 8%. This numbers should help average Filipinos to know draft amount of materials needed for minor concreting works.

To see all the material prices we have posted click here.

Please let us know how this blog helped you by subscribing, hitting like or share!

Swimming Pool Accessories Price Guide

This is a construction price guide for building a swimming pool. The earthworks, structural and architectural were not included.

PLUMBING & EQUIPMENT
 Description Unit Qty  Materials  Labor  Other  Total (Php)
Supply and install valves, pipings, fittings and other items as necessary  Lot            1.00     103,700.00     31,110.00    37,746.80     172,556.80
Centrifugal pump/motor 2HP, 230v  Item            1.00       41,480.00       3,050.00    12,468.40       56,998.40
Sand Filter 360T2  w/ Multiport Valve  Item            1.00       73,200.00       3,050.00    21,350.00       97,600.00
Maindrain Cover  Item            1.00         1,830.00          366.00         614.88         2,810.88
Vacum Fittings  Item            2.00            732.00       1,830.00         717.36         6,558.72
Return Fittings  Item            4.00            732.00          152.50         247.66         4,528.64
Vacuum cleaning set  Item            2.00       18,300.00       1,830.00      5,636.40       51,532.80
Hydrostatic relief valve  Item            1.00         1,708.00          366.00         580.72         2,654.72
    395,240.96
 ELECTRICAL & UNDERWATER LIGHTS
 Description Unit Qty  Materials  Labor  Other  Total (Php)
Underwater Light  12v  Item            8.00       17,080.00       1,464.00      5,192.32     189,890.56
Mounting Ring  Item            8.00         1,708.00          512.40         621.71       22,736.90
Deck Box  Item            6.00         1,098.00          244.00         375.76       10,306.56
Transformer 300w / 12-16 v  Item            4.00         3,660.00          610.00      1,195.60       21,862.40
Conduits 3/4″ diameter  lot            1.00       18,300.00       5,490.00      6,661.20       30,451.20
#10 Wire  lot            1.00       36,600.00     10,980.00    13,322.40       60,902.40
Panel Board  Item            1.00       18,300.00       1,830.00      5,636.40       25,766.40
Magnetic Switch  Item            1.00         3,904.00          610.00      1,263.92         5,777.92
Push Botton Switches  Item            4.00            610.00          146.40         211.79         3,872.77
    371,567.10
 OTHER WORKS
 Description Unit Qty  Materials  Labor  Other  Total (Php)
Construction of balancing tank  Item            1.00     140,300.00     42,090.00    51,069.20     233,459.20
Construction of filtration room  Item            1.00     140,300.00     42,090.00    51,069.20     233,459.20
Supply of water line from sourec to pump room using PVC pipes  item            1.00       21,960.00       6,588.00      7,993.44       36,541.44
Supply of power from source to pump room. Tapping not included  item            1.00       30,500.00       30,500.00
Testing & Commissioning  item            1.00       18,300.00       5,490.00      6,661.20       30,451.20
One month maintenance  item            1.00       12,200.00       6,100.00      5,124.00       23,424.00
    587,835.04

To see all the material prices we have posted click here.

Looking for a material breakdown per area for painting works? Click this link. Or perhaps  this Tiling Works Materials Breakdown is the one you are searching for.

Please let us know how this blog helped you by subscribing, hitting like or share!

Region 10 – Painting Works Prices

PAINTS
Region X
Material Description Unit  Ave. Price (Php)
Paint Tinting Color ltr                  308.78
Paint Aluminum gal                  658.34
Paint Enamel gal                  703.00
Paint Latex Gloss gal                  678.73
Paint Latex Semi Gloss gal                  663.19
Paint Red Lead gal                  583.57
Thinner Paint gal                  292.27
Thinner Lacquer gal                  415.10
Paint Metal Epoxy gal               1,029.26
Paint Primer Solvent gal                  703.00
Brush Paint (101mm) pc                  100.01
Brush Roller (152mm) pc                    95.16
Brush Steel (101mm) pc                    46.61
Oil Paint ltr                  161.19
Spar Varnish ltr                  380.63
Lacquer Putty kg                  175.75

To see all the material prices we have posted click here.

Please let us know how this blog helped you by subscribing, hitting like or share!

Price Guide to Elevator Construction

This is a bill of quantity price guide to complete installation, testing and commissioning of elevator for a 6-Story building.

GENERAL REQUIREMENTS / PRELIMINARIES
Description Qty Unit Amount (Php)
A. Mobilization (Temporary Office (including construction/relocation of temporaryfacilities)
Contractor’s Office 1 lot         51,750.00
Warehouse 1 lot         51,750.00
B. Cleaning and Disposal of Garbage/Debris 1 lot         17,250.00
C. Premium for Insurance and Bonds (including Renewal Cost up to Project Completion)
Surety Bond (Equivalent to 10% contract amount) 1 lot         21,968.65
Performance Bond (Equivalent to 10% contract amount) 1 lot         43,937.29
Guarantee Bond (Equivalent to 10% contract amount) 1 lot       109,814.06
D. Water and Electric Consumption 1 lot         23,000.00
E. Demobilization  (Clearing, removal of temporary facilities, Tools, Debris, Excess Materials, etc.) 1 lot         17,250.00
F. Other Requirements (Pls. specify)
Permits (Incl. Mayor’s City tax, & Other Misc. Permit charges) 1 lot         88,895.00
Cost of Local Procurement/ Material (Incl. Drawings/ Plotting, PME Sign & Seal materials door safety nettings, barricades, consumable materials, welding rods, wire, etc. 1 lot       492,200.00
Cable + Conduit (for WTB-Watch Tower Board or Supervisory Panel 1 lot         34,500.00
Total       952,315.00
ELEVATOR WORKS, TESTING & COMMISSIONING
Description Qty Unit Amount (Php)
Installation of Scaffolding 1 lot         17,503.00
Hoisting 1 lot         26,254.50
Template Setting 1 lot         43,757.50
Marking and Boring of Holes 1 lot         26,254.50
Bracket Setting 1 lot         35,006.00
Rail Setting 1 lot         43,757.50
Sill/Jamb Installation 1 lot         52,509.00
Floor Indicator/Call buttons 1 lot           8,751.50
Machine Room Equipment Setting 1 lot         43,757.50
Machine Room Piping 1 lot         17,503.00
Hoist-way Piping 1 lot         43,757.50
Landing Door Assembly 1 lot         35,006.00
Car Assembly 1 lot         61,260.50
Travelling Cable Lay-out 1 lot         21,878.75
CWT Assembly 1 lot         21,878.75
Lay-out of Ropes 1 lot         26,254.50
Wiring (Machine Room/Hoist-way) 1 lot         70,012.00
Initial Test 1 lot         52,509.00
Slow Speed test (Start up) 1 lot         26,254.50
Load Test 1 lot         13,127.25
Drop Test 1 lot         13,127.25
Buffer Test 1 lot           8,751.50
Plate Setting/Slow Switch Installation 1 lot         43,757.50
Rubber Block Setting 1 lot         17,503.00
High Speed Testing 1 lot         61,260.50
Standard/Special Feature Test 1 lot         26,254.50
Others 1 lot         17,503.00
Total       875,150.00

To see all the material prices we have posted click here.

Please let us know how this blog helped you by subscribing, hitting like or share!

Region 10 – Reinforced Concrete Pipe Prices

PIPE CULVERTS AND STORM DRAINS
Region X
Material Description Unit  Ave. Price (Php)
Reinforced Concrete Pipe Class II Dia 12″ (300mm) pc                  538.91
Reinforced Concrete Pipe Class II Dia 18″ (460mm) pc                  767.09
Reinforced Concrete Pipe Class II Dia 24″ (610mm) pc               1,543.89
Reinforced Concrete Pipe Class II Dia 30″ (760mm) pc               1,950.74
Reinforced Concrete Pipe Class II Dia 36″ (910mm) pc               2,378.95
Reinforced Concrete Pipe Class II Dia 42″ 1070mm) pc               3,417.92
Reinforced Concrete Pipe Class II Dia 48″ (1220mm) pc               4,398.63
Reinforced Concrete Pipe Class II Dia 54″ (1370mm) pc               5,330.79
Reinforced Concrete Pipe Class II Dia 60″ (1524mm) pc               6,224.11
Reinforced Concrete Pipe Class IV Dia 12″ (300mm) pc                  765.15
Reinforced Concrete Pipe Class IV Dia 18″ (460mm) pc               1,019.55
Reinforced Concrete Pipe Class IV Dia 24″ (610mm) pc               1,784.70
Reinforced Concrete Pipe Class IV Dia 30″ (760mm) pc               2,263.40
Reinforced Concrete Pipe Class IV Dia 36″ (910mm) pc               3,058.65
Reinforced Concrete Pipe Class IV Dia 42″ 1070mm) pc               3,670.38
Reinforced Concrete Pipe Class IV Dia 48″ (1220mm) pc               4,741.39
Reinforced Concrete Pipe Class IV Dia 54″ (1370mm) pc               5,393.91
Reinforced Concrete Pipe Class IV Dia 60″ (1524mm) pc               6,351.31