Region 4A – Painting Works Prices

PAINTS
Region IV-A
Material Description Unit  Ave. Price (Php)
Paint Tinting Color ltr                  197.90
Paint Aluminum gal                  583.53
Paint Enamel gal                  589.53
Paint Latex Gloss gal                  571.64
Paint Latex Semi Gloss gal                  584.69
Paint Red Lead gal                  428.18
Thinner Paint gal                  210.38
Thinner Lacquer gal                  291.72
Paint Metal Epoxy gal                  611.82
Paint Primer Solvent gal                  407.36
Brush Paint (101mm) pc                    76.81
Brush Roller (152mm) pc                    86.32
Brush Steel (101mm) pc                    45.65
Oil Paint ltr                  167.79
Spar Varnish ltr                  730.69
Lacquer Putty kg                  601.20

To see all the material prices we have posted click here.

Please let us know how this blog helped you by subscribing, hitting like or share!

Price Guide to Basic Hardscape Works

Price guide to simple hardscaping works. Security, project management, temporary facility and control, and as-built preparation are not included as it vary per location.

Product and Execution Requirements
Description QTY Unit  Amount (Php) 
Product Storage and Handling (Contractor’s Temporary Warehouse) 1 lot           20,000.00
Construction Layout and Surveying 1 lot           20,000.00
Local Business Permit 1 lot           20,000.00
Cleaning 1 lot           20,000.00
Description QTY Unit Material (Php) Labor (Php)
Dampproofing  and Waterproofing
Cementitious and Reactive Waterproofing 1 SQ.M.                690.00        200.00
Colorless Floor Hardener 1 SQ.M.                135.00           56.25
Tiles, Stampcrete and Accessories
Supply, Delivery and Installation of Granite (150mm x 150mm) 1 SQ.M.             3,450.00     1,800.00
Supply, Delivery and Installation of Granite (300mm x 600mm) 1 SQ.M.             4,300.00     1,800.00
Supply, Delivery and Installation of #10 Crushed Granite (Washout) 1 SQ.M.             3,290.00        350.00
Supply, Delivery and Installation of Homogeneous Tiles (600mm x 600mm) 1 SQ.M.             1,515.00        350.00
Supply, Delivery and Installation of Homogeneous Tiles (300mm x 300mm) 1 SQ.M.             1,525.00        350.00
Supply, Delivery and Installation of 150mm Wide Stampcrete 1 SQ.M.             1,950.00        300.00
Supply, Delivery and Installation of Stampcrete 1 SQ.M.             1,950.00        300.00
Lighting Accessories
Supply, Delivery and Installation of Recessed Steplight (15W Die Cast Aluminum with Front Panels) 1 pc             6,900.00     3,800.00

Performance, Surety and Guarantee Bonds are also not included.

Looking for per square meter area materials breakdown of tiling works? check this post.

To see all the material prices we have posted click here.

Please let us know how this blog helped you by subscribing, hitting like or share!

Swimming Pool Accessories Price Guide

This is a construction price guide for building a swimming pool. The earthworks, structural and architectural were not included.

PLUMBING & EQUIPMENT
 Description Unit Qty  Materials  Labor  Other  Total (Php)
Supply and install valves, pipings, fittings and other items as necessary  Lot            1.00     103,700.00     31,110.00    37,746.80     172,556.80
Centrifugal pump/motor 2HP, 230v  Item            1.00       41,480.00       3,050.00    12,468.40       56,998.40
Sand Filter 360T2  w/ Multiport Valve  Item            1.00       73,200.00       3,050.00    21,350.00       97,600.00
Maindrain Cover  Item            1.00         1,830.00          366.00         614.88         2,810.88
Vacum Fittings  Item            2.00            732.00       1,830.00         717.36         6,558.72
Return Fittings  Item            4.00            732.00          152.50         247.66         4,528.64
Vacuum cleaning set  Item            2.00       18,300.00       1,830.00      5,636.40       51,532.80
Hydrostatic relief valve  Item            1.00         1,708.00          366.00         580.72         2,654.72
    395,240.96
 ELECTRICAL & UNDERWATER LIGHTS
 Description Unit Qty  Materials  Labor  Other  Total (Php)
Underwater Light  12v  Item            8.00       17,080.00       1,464.00      5,192.32     189,890.56
Mounting Ring  Item            8.00         1,708.00          512.40         621.71       22,736.90
Deck Box  Item            6.00         1,098.00          244.00         375.76       10,306.56
Transformer 300w / 12-16 v  Item            4.00         3,660.00          610.00      1,195.60       21,862.40
Conduits 3/4″ diameter  lot            1.00       18,300.00       5,490.00      6,661.20       30,451.20
#10 Wire  lot            1.00       36,600.00     10,980.00    13,322.40       60,902.40
Panel Board  Item            1.00       18,300.00       1,830.00      5,636.40       25,766.40
Magnetic Switch  Item            1.00         3,904.00          610.00      1,263.92         5,777.92
Push Botton Switches  Item            4.00            610.00          146.40         211.79         3,872.77
    371,567.10
 OTHER WORKS
 Description Unit Qty  Materials  Labor  Other  Total (Php)
Construction of balancing tank  Item            1.00     140,300.00     42,090.00    51,069.20     233,459.20
Construction of filtration room  Item            1.00     140,300.00     42,090.00    51,069.20     233,459.20
Supply of water line from sourec to pump room using PVC pipes  item            1.00       21,960.00       6,588.00      7,993.44       36,541.44
Supply of power from source to pump room. Tapping not included  item            1.00       30,500.00       30,500.00
Testing & Commissioning  item            1.00       18,300.00       5,490.00      6,661.20       30,451.20
One month maintenance  item            1.00       12,200.00       6,100.00      5,124.00       23,424.00
    587,835.04

To see all the material prices we have posted click here.

Looking for a material breakdown per area for painting works? Click this link. Or perhaps  this Tiling Works Materials Breakdown is the one you are searching for.

Please let us know how this blog helped you by subscribing, hitting like or share!

Region 10 – Painting Works Prices

PAINTS
Region X
Material Description Unit  Ave. Price (Php)
Paint Tinting Color ltr                  308.78
Paint Aluminum gal                  658.34
Paint Enamel gal                  703.00
Paint Latex Gloss gal                  678.73
Paint Latex Semi Gloss gal                  663.19
Paint Red Lead gal                  583.57
Thinner Paint gal                  292.27
Thinner Lacquer gal                  415.10
Paint Metal Epoxy gal               1,029.26
Paint Primer Solvent gal                  703.00
Brush Paint (101mm) pc                  100.01
Brush Roller (152mm) pc                    95.16
Brush Steel (101mm) pc                    46.61
Oil Paint ltr                  161.19
Spar Varnish ltr                  380.63
Lacquer Putty kg                  175.75

To see all the material prices we have posted click here.