So, a lot of readers were asking for house construction prices. True to our mission to help ordinary Filipinos get a clear idea on how much houses are constructed, this post should help you.
The perspective below comes with its bill of quantity with percentage breakdown and floor plans.

The total price below may be higher or lower depending on the materials you will be using and the labor rates in your area. The depth of foundation is at 0.70m from the natural ground line to help with the structural integrity considering nowadays that we are experiencing crazy climate change aftermath.
The windows are all aluminum sliding except for the toilet that is awning. Solid core doors are set for exterior doors main and rear), hollow ones are for the bedrooms. PVC door for the toilet room.
We’ve scouted a site with good customer reviews for their hand tools on this site, they ship nationwide!
6″ concrete hollow block for all exterior walls and 4″ for the interior. Fiber cement board ceiling for exterior and toilet while plywood for interior, all with aluminum framing. The roof framing are all steel.
Follow us on Facebook!
Excavation (and Backfilling) | 5,871.29 | 1.18% |
Concreting Works | ||
1.) Gravel Bed | 3,302.03 | 0.66% |
2.) Concrete | 47,007.40 | 9.46% |
3.) Reinforcing Bars | 51,166.80 | 10.30% |
4.) Formworks | 15,617.33 | 3.14% |
Masonry Works | ||
1.) Exterior Masonry | 43,520.21 | 8.76% |
2.) Interior Masonry | 16,681.87 | 3.36% |
Plastering Works | 24,384.14 | 4.91% |
Ceiling Works | 42,076.49 | 8.47 |
Painting Works | ||
1.) Concrete Painting | 22,385.78 | 4.51% |
2.) Wood Painting | 16,964.87 | 3.41% |
3.) Metal Painting (Roof Framing) | 10,513.06 | 2.12 |
Septic Tank | 19,598.36 | 3.94% |
Tiling Works | 26,104.13 | 5.25% |
Roofing Works | 47,894.56 | 9.64% |
Hardware | 7,231.25 | 1.46% |
Doors and Window | 49,996.12 | 10.06% |
Plumbing Works | 29,350.10 | 5.91% |
Electrical Works | 17,219.40 | 3.47% |
TOTAL | 496,885.18 | 100.00% |



Check other House Plans here:
Get the complete plan (pdf, short bond paper size) with Bill of Materials (excel) incorporated with labor calculations. Just input the labor rates in your area, prices of the materials and viola! You’ll get the total amount and the time needed to complete certain works. More details HERE. or know more on how to pay via Gcash here.
Bungalow Uno Bundle Amount : Php 350.00
Inclusions:
- Bill of Materials (How many bags of cement, tiles, reinforcing bars will you need) with Labor timeline estimates (How many hours for a foreman, skilled and unskilled workers are needed to complete a certain work).
2. Floor plan, perspective and elevations.
3. Power and lighting layout.
4. Sanitary and waterline layout with Septic and Grease Trap Details.
5. Foundation Plan.
6. Column, Footing and Beam Details.
7. Roof Framing and Beam Plan.
Limitations: This excel file will only work for this set Plan. Labor calculations are pre-assumed based on average productivity rate of laborers in the Philippines.
Exclusions: Structural Calculations. Sign and seal of Professional Engineer / Architect. You cannot use this to apply for building permit unless re-drawn, signed and sealed by a professional.
Disclaimer: The plans are just guides. That is why it is cheap. Though the structural concepts, depths of foundations, beams and column sizes, reinforcing bars are considered with our intellect and experience as licensed civil engineers, it is ALWAYS advisable to hire a professional that you trust to design your homes, construct the plans at your own risk.
If you have any questions email us. We now offer signed and sealed plans for Building Permit Applications.
Let us know how this post helped you by commenting. Stay safe!
for the estmation price for Uno Bungalow ann is included? Material and labor cost?
Hello Amie,
Material and Labor cost are included. Not included are the ff: professional fees, delivery costs, contractor’s profit, prelims, etc.
The calculations for all bungalows are just ballpark numbers for materials, labor, and equipment. Thanks!
hi po meron po kayo 2 storey with estimate po and specification. pang school project po sana. pati complete floor plan po. thanks
Magkano po yung 36 sq.m na bungalow na complete with floor plan and labor costs and materials. Salamat po
GODevening po…nagtanong po ako kasi interesado po kasi kilala ko pagawa 8 door apartment 4 sa baba at 4 sa taas ang sukat po bawat isa ay 36 sq meters