List of Construction Prices for Concreting Works Philippines

Concreting Works
Concrete
Soil Poisoning – Termicide Liter        325.00
Gravel cu.m     1,310.00
Wash Sand cu.m     1,435.00
Portland Cement, 40kg Bag        259.00
Pozzolan Cement, 40kg Bag        261.00
Steel Bars
 10mm Diameter Deformed Bars pc        156.00
 12mm Diameter Deformed Bars pc        221.00
 16mm Diameter Deformed Bars pc        392.00
 20mm Diameter Deformed Bars pc        642.00
 #16 G.I. Tie Wire kg          16.00
Formworks
 2 x 3 x 10′ Coco lumber pc        270.00
 2 x 4 x 10 Coco lumber pc        270.00
 1/2″ x 4′ x 8′ Plywood pc        656.00
 6mm thk. Lawanit board pc        201.00
 6mm thk. Ordinary Plywood pc        323.00
 1″x2″x8′ Wood pc          75.00
 2″x2″x8′ Wood pc          95.00
 2″x3″x8′ Wood pc          105.00
 2″x4″x8′ Wood pc          125.00

All amount in Php. To see all the material prices we have posted click here.

Looking for per square meter area breakdown of tiling works? check this post.

Please let us know how this blog helped you by subscribing, hitting like or share!

Electrical Conduit Prices per Commercial Length

Electrical Pipe Prices per Commercial Length
Description Unit  Amount (Php)
IMC PIPE 1/2″ (15mm) x 3M w/ COUPLING pc                227.70
IMC PIPE 3/4″ (20mm) x 3M w/ COUPLING pc                294.19
IMC PIPE 1″ (25mm) x 3M w/ COUPLING pc                515.53
IMC PIPE 1-1/4″ (32mm) x 3M w/ COUPLING pc                613.88
IMC PIPE 1-1/2″ (40mm) x 3M w/ COUPLING pc                777.52
IMC PIPE 2″ (50mm) x 3M w/ COUPLING pc                992.70
IMC PIPE 2-1/2″ (65mm) x 3M w/ COUPLING pc             1,685.50
IMC PIPE 3″ (80mm) x 3M w/ COUPLING pc             2,060.26
IMC PIPE 3-1/2″ (90mm) x 3M w/ COUPLING pc             3,091.29
IMC PIPE 4″ (100mm) x 3M w/ COUPLING pc             3,583.05
FMC ORDINARY 1/2″ (15mm) pc                  21.59
FMC LT 4″ (100mm) pc             1,841.44
FMC LT 30″ (80mm) pc             1,095.94
FMC LT 2-1/2″ (65mm) pc                924.46
PVC CONDUIT 20MM (1/2″) x 3m pc                  58.14
PVC CONDUIT 25MM (3/4″) x 3m pc                  76.04
PVC CONDUIT 32MM (1″) x 3m pc                108.09
PVC CONDUIT 40MM (1-1/4″) x 3m pc                137.92
PVC CONDUIT 63MM (2″) x 3m pc                222.17
PVC CONDUIT 110MM (4″) x 3m pc                673.96

VAT not included.

To see all the material prices we have posted click here.

Please let us know how this blog helped you by subscribing, hitting like or share!

Deformed Reinforcing Bars Prices per Length

Deformed Reinforcing Bars Prices
Description Unit  Amount (php)
 REBAR, Gr 40, 12mm dia x 6m pc                 187.13
 REBAR, Gr 40, 12mm dia x 7.5m pc                 233.92
 REBAR, Gr 40, 12mm dia x 9m pc                 280.69
 REBAR, Gr 40, 12mm dia x 10.5m pc                 327.47
 REBAR, Gr 40, 12mm dia x 12m pc                 374.26
 REBAR, Gr 60, 16mm dia x 6m pc                 334.42
 REBAR, Gr 60, 16mm dia x 7.5m pc                 418.02
 REBAR, Gr 60, 16mm dia x 9m pc                 501.62
 REBAR, Gr 60, 16mm dia x 10.5m pc                 585.23
 REBAR, Gr 60, 16mm x 12m pc                 668.83
 REBAR, Gr 60, 20mm dia x 6.0m pc                 522.60
 REBAR, Gr 60, 20mm dia x 10.5m pc                 914.56
 REBAR, Gr 60, 25mm dia x 6.0m pc                 816.55
 REBAR, Gr 60, 25mm x 9.0m pc              1,224.82
 REBAR, Gr 60, 25mm dia x 10.5m pc              1,428.97
 REBAR, Gr 60, 25mm dia x 12m pc              1,633.10

VAT not included.

To see all the material prices we have posted click here.

Please let us know how this blog helped you by subscribing, hitting like or share!

Region 4A – Concrete Curing and Admixtures Prices

CONCRETE CURING MATERIALS AND ADMIXTURES
Region IV-A
Material Description Unit  Ave. Price (Php)
Concrete Admixture Accelerating ltr                    66.45
Concrete Admixture Accelerating bag                  287.00
Concrete Admixture Retarding ltr                    47.67
Concrete Admixture Retarding bag                  327.08
Concrete Admixture Water-reducing ltr                    60.76
Concrete Admixture Water-reducing bag                  445.90
Concrete Admixture Water-reducing and Accelerating ltr                  119.20
Concrete Admixture Water-reducing and Accelerating bag                  388.63
Concrete Admixture Water-reducing High-range ltr                    61.87
Concrete Admixture Water-reducing High-range bag                  322.79
Concrete Admixture Water-reducing and Retarding ltr                  120.60
Concrete Admixture Water-reducing and Retarding bag                  536.25
Concrete Admixture Water-reducing, High-range and Retarding ltr                    69.52
Concrete Admixture Water-reducing, High-range and Retarding bag                  451.50
Water Proofing Cement (Sahara or Equivalent) bag                    45.43

To see all the material prices we have posted click here.

Please let us know how this blog helped you by subscribing, hitting like or share!

Region 4A -Metal Roofing Prices

METAL ROOFING
Region IV-A
Material Description Unit  Ave. Price (Php)
Corrugated Roofing, Gauge 26 (0.51mm x 2.44mm) sqm                  261.90
Pre-painted Metal Roofing Sheet Ga. 26 Long Span sqm                  359.51
Pre-painted Metal Roofing Sheet Ga. 26 x 2.44m sqm                  330.58
Pre-painted Gutter, GA 24(0.701mm) x 2.44m lnm                  162.14
Ordinary Gutter, GA 24(0.701mm) x 2.44m lnm                  100.43
Pre-painted Flashing, GA 24(0.701mm) x 2.44m) lnm                  163.77
Ordinary Flashing, GA 24(0.701mm) x 2.44m) lnm                    96.59
Pre-painted Ridge Roll, GA 24(0.701mm) x 2.44m) lnm                  164.58
Ordinary Ridge Roll, GA 24(0.701mm) x 2.44m) lnm                    96.59
Roof Ventilators lnm               1,269.79

To see all the material prices we have posted click here.

Please let us know how this blog helped you by subscribing, hitting like or share!

Slope Stabilization Mesh System Prices

Slope Stabilization Mesh System
Description Unit Price (Php)
3mm Ø High Tensile Wire mesh (3.5x30mm) sq.m 6,992.00
10mm Ø Tensile Rope Anchor ln.m 1,012.00
4mm Ø High Tensile Wire Clips pc 138.00
10mm Ø Tensile Wire Rope Anchor pc 4,600.00
Anchor Bolt (32mmØ x 2.5m) pc 966.00
Threading of Bolts w/ nuts pc 1,288.00
Non-Shrink Grout bags 552.00
Centralizer pc 230.00
Drill Bit pc 18,400.00
Centrosema Seeds kgs. 294.40
Enzyme ltrs. 13.80
3D Geonet sq.m 598.00

To see all the material prices we have posted click here.

Please let us know how this blog helped you by subscribing, hitting like or share!

Region 10 – Metal Structure Prices

METAL STRUCTURES
Region X
Material Description Unit  Ave. Price (Php)
Milled Steel Plates Checked FY36 kg                    62.73
Milled Steel Plates FY36 kg                    61.44
Steel Sheet Stainless kg                  197.68
Bridge Rollers and Rockers pc               4,666.55
Pins and Pin Holes FY60 kg                    81.02
Sliding Bearing pc               4,709.93
Structural Steel Angular Bar (A36) kg                    70.24
Structural Steel Channel Bar (A36) kg                    69.62
Structural Steel Square Bar (A36) kg                    69.91
Structural Steel I-Beam (A36) kg                    71.57
Strutural Steel Wide Flange (A36) kg                    69.91
Rivets High Tension kg                  157.29
Washers high Tension kg                  159.10
Cork Expansion Joint Filler (.019m x 1.2m x 2.44m) pc                  609.98
Bolts High Tension kg                  170.72

To see all the material prices we have posted click here.

Please let us know how this blog helped you by subscribing, hitting like or share!

Price Guide to Basic Hardscape Works

Price guide to simple hardscaping works. Security, project management, temporary facility and control, and as-built preparation are not included as it vary per location.

Product and Execution Requirements
Description QTY Unit  Amount (Php) 
Product Storage and Handling (Contractor’s Temporary Warehouse) 1 lot           20,000.00
Construction Layout and Surveying 1 lot           20,000.00
Local Business Permit 1 lot           20,000.00
Cleaning 1 lot           20,000.00
Description QTY Unit Material (Php) Labor (Php)
Dampproofing  and Waterproofing
Cementitious and Reactive Waterproofing 1 SQ.M.                690.00        200.00
Colorless Floor Hardener 1 SQ.M.                135.00           56.25
Tiles, Stampcrete and Accessories
Supply, Delivery and Installation of Granite (150mm x 150mm) 1 SQ.M.             3,450.00     1,800.00
Supply, Delivery and Installation of Granite (300mm x 600mm) 1 SQ.M.             4,300.00     1,800.00
Supply, Delivery and Installation of #10 Crushed Granite (Washout) 1 SQ.M.             3,290.00        350.00
Supply, Delivery and Installation of Homogeneous Tiles (600mm x 600mm) 1 SQ.M.             1,515.00        350.00
Supply, Delivery and Installation of Homogeneous Tiles (300mm x 300mm) 1 SQ.M.             1,525.00        350.00
Supply, Delivery and Installation of 150mm Wide Stampcrete 1 SQ.M.             1,950.00        300.00
Supply, Delivery and Installation of Stampcrete 1 SQ.M.             1,950.00        300.00
Lighting Accessories
Supply, Delivery and Installation of Recessed Steplight (15W Die Cast Aluminum with Front Panels) 1 pc             6,900.00     3,800.00

Performance, Surety and Guarantee Bonds are also not included.

Looking for per square meter area materials breakdown of tiling works? check this post.

To see all the material prices we have posted click here.

Please let us know how this blog helped you by subscribing, hitting like or share!

Guide to Cement and Aggregates Factors per Concrete Class Mixture

Handy guide on factors to multiply per cubic on different concrete class mixtures. Just multiply each factor to the total volume (in cubic meter) and you’ll get the needed amount of cement (40Kg/bag), sand (cu.m.) and gravel (cu.m.).

Class C (2,000 psi)
Cement 5.634 Bags
Sand 0.4794 cu.m.
Gravel 0.898 cu.m.
Class B (2,500 psi)
Cement 7.399 Bags
Sand 0.486 cu.m.
Gravel 0.8856 cu.m.
Class A (3,500 psi)
Cement 8.799 Bags
Sand 0.5724 cu.m.
Gravel 0.856 cu.m.
Class AA (4,000 psi)
Cement 11.729 Bags
Sand 0.475 cu.m.
Gravel 0.8344 cu.m.

The following factors were already added an average wastage add-ons of around 5% to 8%. This numbers should help average Filipinos to know draft amount of materials needed for minor concreting works.

To see all the material prices we have posted click here.

Please let us know how this blog helped you by subscribing, hitting like or share!

Swimming Pool Accessories Price Guide

This is a construction price guide for building a swimming pool. The earthworks, structural and architectural were not included.

PLUMBING & EQUIPMENT
 Description Unit Qty  Materials  Labor  Other  Total (Php)
Supply and install valves, pipings, fittings and other items as necessary  Lot            1.00     103,700.00     31,110.00    37,746.80     172,556.80
Centrifugal pump/motor 2HP, 230v  Item            1.00       41,480.00       3,050.00    12,468.40       56,998.40
Sand Filter 360T2  w/ Multiport Valve  Item            1.00       73,200.00       3,050.00    21,350.00       97,600.00
Maindrain Cover  Item            1.00         1,830.00          366.00         614.88         2,810.88
Vacum Fittings  Item            2.00            732.00       1,830.00         717.36         6,558.72
Return Fittings  Item            4.00            732.00          152.50         247.66         4,528.64
Vacuum cleaning set  Item            2.00       18,300.00       1,830.00      5,636.40       51,532.80
Hydrostatic relief valve  Item            1.00         1,708.00          366.00         580.72         2,654.72
    395,240.96
 ELECTRICAL & UNDERWATER LIGHTS
 Description Unit Qty  Materials  Labor  Other  Total (Php)
Underwater Light  12v  Item            8.00       17,080.00       1,464.00      5,192.32     189,890.56
Mounting Ring  Item            8.00         1,708.00          512.40         621.71       22,736.90
Deck Box  Item            6.00         1,098.00          244.00         375.76       10,306.56
Transformer 300w / 12-16 v  Item            4.00         3,660.00          610.00      1,195.60       21,862.40
Conduits 3/4″ diameter  lot            1.00       18,300.00       5,490.00      6,661.20       30,451.20
#10 Wire  lot            1.00       36,600.00     10,980.00    13,322.40       60,902.40
Panel Board  Item            1.00       18,300.00       1,830.00      5,636.40       25,766.40
Magnetic Switch  Item            1.00         3,904.00          610.00      1,263.92         5,777.92
Push Botton Switches  Item            4.00            610.00          146.40         211.79         3,872.77
    371,567.10
 OTHER WORKS
 Description Unit Qty  Materials  Labor  Other  Total (Php)
Construction of balancing tank  Item            1.00     140,300.00     42,090.00    51,069.20     233,459.20
Construction of filtration room  Item            1.00     140,300.00     42,090.00    51,069.20     233,459.20
Supply of water line from sourec to pump room using PVC pipes  item            1.00       21,960.00       6,588.00      7,993.44       36,541.44
Supply of power from source to pump room. Tapping not included  item            1.00       30,500.00       30,500.00
Testing & Commissioning  item            1.00       18,300.00       5,490.00      6,661.20       30,451.20
One month maintenance  item            1.00       12,200.00       6,100.00      5,124.00       23,424.00
    587,835.04

To see all the material prices we have posted click here.

Looking for a material breakdown per area for painting works? Click this link. Or perhaps  this Tiling Works Materials Breakdown is the one you are searching for.

Please let us know how this blog helped you by subscribing, hitting like or share!

https://www.googletagmanager.com/gtag/js?id=UA-146841859-1