This guide is a materials breakdown per square meter of floor topping and plain cement finish works. All you have to do is to multiply the factors below with your computed total area (in square meter). All in straight-to-the-point calculations.
The floor topping and cement finish in this guide is set at 50mm thickness.
Floor Cement Finish
Materials Description | Unit | QTY |
Cement | bag | 0.73 |
Sand | cu.m. | 0.06 |
Floor Topping
Materials Description | Unit | QTY |
Cement | Bag | 0.70 |
Sand | cu.m. | 0.06 |
Floor topping are used in mostly residential projects to rectify slant slab-on-grades and to prepare the floor for tiling works. Should you opt to just use plain cement finish, the cheat sheet above should come handy.
These are shared here for the non-technical people to do their own material computation without the need to ask or hire engineers or quantity surveyors.
Check other construction data with the same concept on the links below.
Partition Walls Materials Breakdown per Square Meter
Roofing Works Materials Breakdown per Square Meter
Painting Works Materials Breakdown per Square Meter
Tiling Works Materials Breakdown per Square Meter
Ceiling Construction Materials Breakdown per Square Meter
Metal Gate Construction Materials Breakdown and Prices
Let us know how this painting per square meter materials breakdown blog helps by liking, sharing or commenting!