Material Description Unit  Amount (PhP)
Reinforced Concrete Pipe Class II – 300mm pc                606.85
Reinforced Concrete Pipe Class II – 460mm pc                961.27
Reinforced Concrete Pipe Class II – 610mm pc             1,536.72
Reinforced Concrete Pipe Class II – 760mm pc             2,214.09
Reinforced Concrete Pipe Class II – 910mm pc             2,660.47
Reinforced Concrete Pipe Class II – 1070mm pc             3,577.39
Reinforced Concrete Pipe Class II – 1220mm pc             4,520.05
Reinforced Concrete Pipe Class II – 1370mm pc             5,563.22
Reinforced Concrete Pipe Class II – 1524mm pc             6,592.50
Reinforced Concrete Pipe Class IV – 300mm pc                853.77
Reinforced Concrete Pipe Class IV – 460mm pc             1,439.37
Reinforced Concrete Pipe Class IV – 610mm pc             1,954.68
Reinforced Concrete Pipe Class IV – 760mm pc             3,046.18
Reinforced Concrete Pipe Class IV – 910mm pc             3,677.80
Reinforced Concrete Pipe Class IV – 1070mm pc             4,625.03
Reinforced Concrete Pipe Class IV- 1220mm pc             6,448.28
Reinforced Concrete Pipe Class IV – 1370mm pc             7,799.12
Reinforced Concrete Pipe Class IV – 1524mm pc             9,913.32
Perforated Concrete Pipe  – 150 mm pc                355.35
Perforated Concrete Pipe – 200 mm pc                434.28
Perforated Concrete Pipe – 300 mm pc                543.78

These prices are calculated using cost-averaging formula. Some locations’ costs may be more expensive compared to the other. We simplified it this way for easy price updating.

To see all the material prices we have posted click here.

Please let us know how this blog helped you by subscribing, hitting like or share!

Visayas RCP and Perforated Pipe Price

Visayas – Reinforced Concrete and Perforated Pipe Price
Material Description Unit  Amount (PhP)
Reinforced Concrete Pipe Class II – 300mm pc                682.71
Reinforced Concrete Pipe Class II – 460mm pc             1,306.21
Reinforced Concrete Pipe Class II – 610mm pc             1,652.61
Reinforced Concrete Pipe Class II – 760mm pc             2,159.60
Reinforced Concrete Pipe Class II – 910mm pc             3,175.52
Reinforced Concrete Pipe Class II – 1070mm pc             3,612.49
Reinforced Concrete Pipe Class II – 1220mm pc             4,247.02
Reinforced Concrete Pipe Class II – 1370mm pc             5,896.92
Reinforced Concrete Pipe Class II – 1524mm pc             6,647.60
Reinforced Concrete Pipe Class IV – 300mm pc                890.31
Reinforced Concrete Pipe Class IV – 460mm pc             1,464.84
Reinforced Concrete Pipe Class IV – 610mm pc             2,084.25
Reinforced Concrete Pipe Class IV – 760mm pc             3,405.09
Reinforced Concrete Pipe Class IV – 910mm pc             4,665.06
Reinforced Concrete Pipe Class IV – 1070mm pc             6,097.24
Reinforced Concrete Pipe Class IV- 1220mm pc             7,536.10
Reinforced Concrete Pipe Class IV – 1370mm pc             8,533.24
Reinforced Concrete Pipe Class IV – 1524mm pc           10,978.73
Perforated Concrete Pipe  – 150 mm pc                435.42
Perforated Concrete Pipe – 200 mm pc                518.48
Perforated Concrete Pipe – 300 mm pc                581.52

These prices are calculated using cost-averaging formula. Some locations’ costs may be more expensive compared to the other. We simplified it this way for easy price updating.

To see all the material prices we have posted click here.

Please let us know how this blog helped you by subscribing, hitting like or share!

Luzon RCP and Perforated Pipe Price

Luzon – Reinforced Concrete and Perforated Pipe Price
Material Description Unit  Amount (PhP)
Reinforced Concrete Pipe Class II – 300mm pc                665.16
Reinforced Concrete Pipe Class II – 460mm pc                914.05
Reinforced Concrete Pipe Class II – 610mm pc             1,284.50
Reinforced Concrete Pipe Class II – 760mm pc             1,928.82
Reinforced Concrete Pipe Class II – 910mm pc             2,730.96
Reinforced Concrete Pipe Class II – 1070mm pc             3,209.00
Reinforced Concrete Pipe Class II – 1220mm pc             3,997.09
Reinforced Concrete Pipe Class II – 1370mm pc             5,086.06
Reinforced Concrete Pipe Class II – 1524mm pc             6,002.10
Reinforced Concrete Pipe Class IV – 300mm pc                729.92
Reinforced Concrete Pipe Class IV – 460mm pc             1,134.57
Reinforced Concrete Pipe Class IV – 610mm pc             1,799.93
Reinforced Concrete Pipe Class IV – 760mm pc             2,735.48
Reinforced Concrete Pipe Class IV – 910mm pc             3,371.05
Reinforced Concrete Pipe Class IV – 1070mm pc             4,883.25
Reinforced Concrete Pipe Class IV- 1220mm pc             6,162.94
Reinforced Concrete Pipe Class IV – 1370mm pc             7,756.13
Reinforced Concrete Pipe Class IV – 1524mm pc             9,413.22
Perforated Concrete Pipe  – 150 mm pc                356.81
Perforated Concrete Pipe – 200 mm pc                422.26
Perforated Concrete Pipe – 300 mm pc                543.30

These prices are calculated using cost-averaging formula. Some locations’ costs may be more expensive compared to the other. We simplified it this way for easy price updating.

To see all the material prices we have posted click here.

Please let us know how this blog helped you by subscribing, hitting like or share!

Mindanao Timber – Steel Formworks and Scaffolds Prices

Mindanao – Timber and Steel Formworks and Scaffolds Materials Prices
Material Description Unit  Amount – Php
Concrete Nails Assorted kg              112.73
Common Nails Assorted kg                 71.01
Formed Oil ltr                 29.58
Gi Sheet Plain Gauge 16 x 8′ (1.613mm thk) pc           1,549.62
Gi Sheet Plain Gauge 20 x 8′ (1.006mm thk) pc           1,084.68
Gi Sheet Plain Gauge 26 x 8′ (0.551mm thk) pc              497.46
GI Pipe Schedule 40 Dia (19mm) pc              488.46
GI Pipe Schedule 40 Dia (25.4mm) pc              703.09
GI Pipe Schedule 40 Dia (38mm) pc           1,176.46
GI Pipe Schedule 40 Dia (50.8mm) pc           1,591.42
GI Pipe Schedule 40 Dia (76mm) pc           2,804.00
GI Pipe Schedule 40 Dia (102mm) pc           4,118.79
GI Pipe Schedule 40 Dia (127mm) pc           7,973.22
GI Pipe Schedule 40 Dia (152mm) pc         10,667.75
Lumber Coco bdft                 18.56
Lumber Good bdft                 42.27
Milled Steel Plates Checked FY36 kg                 55.44
Milled Steel Plates FY36 kg                 54.39
Plyboard (0.019m x 1.2m x 2.44m) pc              907.93
Plyboard (0.025m x 1.2m x 2.44m) pc           1,103.45
Plywood Marine (0.00625m x 1.2m x 2.44m) pc              427.16
Plywood Marine (0.0125m x 1.2m x 2.44m) pc              794.74
Plywood Marine (0.019m x 1.2m x 2.44m) pc           1,211.26
Plywood Ordinary (0.0065m x 1.4 x 2.44m) pc              359.71
Plywood Ordinary (0.0125m x 1.4 x 2.44m) pc              658.07
Plywood Ordinary (0.019m x 1.4 x 2.44m) pc              990.46
Steel Deck sqm              855.41

These prices are calculated using cost-averaging formula. Some locations’ costs may be more expensive compared to the other. We simplified it this way for easy price updating.

To see all the material prices we have posted click here.

Please let us know how this blog helped you by subscribing, hitting like or share!

Visayas Timber – Steel Formworks and Scaffolds Prices

Visayas – Timber and Steel Formworks and Scaffolds Materials Prices
Material Description Unit  Amount – Php
Concrete Nails Assorted kg                 86.67
Common Nails Assorted kg                 65.22
Formed Oil ltr                 33.96
Gi Sheet Plain Gauge 16 x 8′ (1.613mm thk) pc           1,487.28
Gi Sheet Plain Gauge 20 x 8′ (1.006mm thk) pc           1,154.13
Gi Sheet Plain Gauge 26 x 8′ (0.551mm thk) pc              553.17
GI Pipe Schedule 40 Dia (19mm) pc              453.54
GI Pipe Schedule 40 Dia (25.4mm) pc              642.09
GI Pipe Schedule 40 Dia (38mm) pc           1,120.46
GI Pipe Schedule 40 Dia (50.8mm) pc           1,529.98
GI Pipe Schedule 40 Dia (76mm) pc           2,824.07
GI Pipe Schedule 40 Dia (102mm) pc           5,332.56
GI Pipe Schedule 40 Dia (127mm) pc           8,778.51
GI Pipe Schedule 40 Dia (152mm) pc           3,660.24
Lumber Coco bdft                 20.95
Lumber Good bdft                 55.06
Milled Steel Plates Checked FY36 kg                 52.93
Milled Steel Plates FY36 kg                 50.75
Plyboard (0.019m x 1.2m x 2.44m) pc              950.14
Plyboard (0.025m x 1.2m x 2.44m) pc           1,136.41
Plywood Marine (0.00625m x 1.2m x 2.44m) pc              387.13
Plywood Marine (0.0125m x 1.2m x 2.44m) pc              746.90
Plywood Marine (0.019m x 1.2m x 2.44m) pc           1,212.24
Plywood Ordinary (0.0065m x 1.4 x 2.44m) pc              352.57
Plywood Ordinary (0.0125m x 1.4 x 2.44m) pc              639.16
Plywood Ordinary (0.019m x 1.4 x 2.44m) pc              997.84
Steel Deck sqm              901.32

These prices are calculated using cost-averaging formula. Some locations’ costs may be more expensive compared to the other. We simplified it this way for easy price updating.

To see all the material prices we have posted click here.

Please let us know how this blog helped you by subscribing, hitting like or share!

Luzon Timber – Steel Formworks and Scaffolds Prices

Luzon – Timber and Steel Formworks and Scaffolds Materials Prices
Material Description Unit  Amount – Php
Concrete Nails Assorted kg                 97.37
Common Nails Assorted kg                 69.75
Formed Oil ltr                 55.54
GI Sheet Plain Gauge 16 x 8′ (1.613mm thk) pc           1,630.60
GI Sheet Plain Gauge 20 x 8′ (1.006mm thk) pc           1,106.63
Gi Sheet Plain Gauge 26 x 8′ (0.551mm thk) pc              505.64
GI Pipe Schedule 40 Dia (19mm) pc              499.90
GI Pipe Schedule 40 Dia (25.4mm) pc              862.34
GI Pipe Schedule 40 Dia (38mm) pc           1,229.21
GI Pipe Schedule 40 Dia (50.8mm) pc           1,698.79
GI Pipe Schedule 40 Dia (76mm) pc           2,808.25
GI Pipe Schedule 40 Dia (102mm) pc           4,037.23
GI Pipe Schedule 40 Dia (127mm) pc           6,676.56
GI Pipe Schedule 40 Dia (152mm) pc           8,739.93
Lumber Coco bdft                 21.10
Lumber Good bdft                 49.13
Milled Steel Plates Checkered FY36 kg                 50.97
Milled Steel Plates FY36 kg                 49.43
Plyboard (0.019m x 1.2m x 2.44m) pc              935.13
Plyboard (0.025m x 1.2m x 2.44m) pc           1,076.26
Plywood Marine (0.00625m x 1.2m x 2.44m) pc              407.11
Plywood Marine (0.0125m x 1.2m x 2.44m) pc              767.06
Plywood Marine (0.019m x 1.2m x 2.44m) pc           1,240.44
Plywood Ordinary (0.0065m x 1.4 x 2.44m) pc              358.41
Plywood Ordinary (0.0125m x 1.4 x 2.44m) pc              652.25
Plywood Ordinary (0.019m x 1.4 x 2.44m) pc           1,094.24
Steel Deck sq.m.              812.91

These prices are calculated using cost-averaging formula. Some locations’ costs may be more expensive compared to the other. We simplified it this way for easy price updating.

To see all the material prices we have posted click here.

Please let us know how this blog helped you by subscribing, hitting like or share!

Mindanao Doors and Windows Prices

DOORS
Material Description Unit  Amount (PhP)
Accordion Type Door SQ.M.             2,133.41
Aluminum Glass Door SQ.M.             5,614.11
Flush Hollow Core Door SQ.M.             1,006.18
Flush Type Solid  Core Door SQ.M.             1,877.94
Glass Transom on Wood SQ.M.             1,905.90
Narra Paneled Door SQ.M.             5,441.55
Tanguile Paneled Door SQ.M.             4,066.00
Varifold Type Door SQ.M.             2,721.32
WINDOWS
Material Description Unit  Amount (PhP)
Aluminum Casement  Window SQ.M.             3,947.39
Awning Type Steel Casement Windows SQ.M.             2,663.48
Fixed Glass Window on Metal Frame SQ.M.             1,181.49
Fixed Louvered Steel Window SQ.M.             1,101.37
Glass Jalousie Window SQ.M.                970.12
Sliding Aluminum Window SQ.M.             4,747.16
Swing Type Steel Casement Windows SQ.M.             2,586.13

These prices are calculated using cost-averaging formula. Some locations’ costs may be more expensive compared to the other. We simplified it this way for easy price updating.

To see all the material prices we have posted click here.

Please let us know how this blog helped you by subscribing, hitting like or share

Visayas Doors and Windows Prices

DOORS
Material Description Unit  Amount (PhP)
Accordion Type Door SQ.M.             2,198.28
Aluminum Glass Door SQ.M.             6,148.13
Flush Hollow Core Door SQ.M.                873.94
Flush Type Solid  Core Door SQ.M.             1,868.77
Glass Transom on Wood SQ.M.             1,897.48
Narra Paneled Door SQ.M.             5,504.32
Tanguile Paneled Door SQ.M.             4,140.01
Varifold Type Door SQ.M.             2,878.76
WINDOWS
Material Description Unit  Amount (PhP)
Aluminum Casement  Window SQ.M.             4,263.58
Awning Type Steel Casement Windows SQ.M.             1,959.80
Fixed Glass Window on Metal Frame SQ.M.                521.22
Fixed Louvered Steel Window SQ.M.                791.80
Glass Jalousie Window SQ.M.                743.02
Sliding Aluminum Window SQ.M.             4,965.09
Swing Type Steel Casement Windows SQ.M.             1,993.03

These prices are calculated using cost-averaging formula. Some locations’ costs may be more expensive compared to the other. We simplified it this way for easy price updating.

To see all the material prices we have posted click here.

Please let us know how this blog helped you by subscribing, hitting like or share

Luzon Doors and Windows Prices

DOORS
Material Description Unit  Amount (PhP)
Accordion Door SQ.M.             2,169.21
Aluminum Glass Door SQ.M.             5,111.61
Flush Hollow Core Door SQ.M.                863.90
Flush Type Solid  Core Door SQ.M.             1,733.05
Glass Transom on Wood SQ.M.             1,792.07
Narra Paneled Type Door SQ.M.             4,981.22
Tanguile Paneled Type Door SQ.M.             3,802.51
Varifold Type Door SQ.M.             3,050.85
WINDOWS
Material Description Unit  Amount (PhP)
Aluminum Casement  Window SQ.M.             4,069.30
Awning Steel Type Casement Windows SQ.M.             1,835.59
Fixed Glass on Metal Frame Window SQ.M.                489.46
Fixed Louvered Steel Window SQ.M.                575.80
Glass Jalousie Window SQ.M.                672.52
Sliding Aluminum Window SQ.M.             4,606.58
Swing Type Steel Casement Windows SQ.M.             1,890.90

These prices are calculated using cost-averaging formula. Some locations’ costs may be more expensive compared to the other. We simplified it this way for easy price updating.

To see all the material prices we have posted click here.

Please let us know how this blog helped you by subscribing, hitting like or share

Average Cost of Septic Tank Construction Philippines

We are getting a lot of  requests about other average construction prices and we are finding time to attend each concerns. This guide should help you (if you do not have any background with construction) as to how much should it cost you to have your own Residential Septic Tanks.

We believe the links below will help you too.

Average Two-Story House Construction Cost

Average House Construction Cost

Bungalow Uno – 36 SQM 2 Bedroom below 500k

Four Rooms Boarding House – 650K ALL-IN

The septic vault plan below comes with its own material price summary.

Sample Septic Tank Plan
Sample Septic Tank Plan
Septic Tank Materials Summary
Description Unit       QTY Amount (PhP)
Excavation cu.m.        6.00         3,000.00
CHB Wall – (18.9 SQ.M.)
100mm thk CHB pcs    245.70         3,931.20
Cement bags        9.92         2,579.85
Sand cu.m.        0.76         1,171.80
Reinforcing Steel kg      61.24         2,939.33
#16 Tie Wire kg        0.95             61.43
Concrete – (2.38 cu.m.)
Gravel including Bed cu.m.        3.00         5,099.49
Sand cu.m.        1.19         1,841.40
Cement bags      21.62         5,621.62
Reinforcing Bars kg    156.20         7,653.56
Plastering Works – (21.6 SQ.M.)
Cement bags        7.13         1,853.28
Sand cu.m.        0.58            903.96
Waterproofing Works – (21.6 SQ.M.)
Cemenitious Waterproofing gal        0.86            777.60
Formworks – (may be used twice)
Formworks & Scaffolds SQ.M.        6.6         2,000.00
Plumbing Works – Septic Vault Only
Pipes and Fittings lot        1.00         1,250.00
>>> GRAND Total       40,684.50

The prices above do not come with the labor cost. Labor cost for this construction should be around 15,000 – 20,000 Php. The timeline for constructing this is 2 weeks at maximum.

If in doubt, it would still be advisable to hire a professional engineer or architect to look over construction.

To see all the material prices we have posted click here.

Please let us know how this blog helped you by subscribing, hitting like or share!

https://www.googletagmanager.com/gtag/js?id=UA-146841859-1