Mindanao Timber – Steel Formworks and Scaffolds Prices

Mindanao – Timber and Steel Formworks and Scaffolds Materials Prices
Material Description Unit  Amount – Php
Concrete Nails Assorted kg              112.73
Common Nails Assorted kg                 71.01
Formed Oil ltr                 29.58
Gi Sheet Plain Gauge 16 x 8′ (1.613mm thk) pc           1,549.62
Gi Sheet Plain Gauge 20 x 8′ (1.006mm thk) pc           1,084.68
Gi Sheet Plain Gauge 26 x 8′ (0.551mm thk) pc              497.46
GI Pipe Schedule 40 Dia (19mm) pc              488.46
GI Pipe Schedule 40 Dia (25.4mm) pc              703.09
GI Pipe Schedule 40 Dia (38mm) pc           1,176.46
GI Pipe Schedule 40 Dia (50.8mm) pc           1,591.42
GI Pipe Schedule 40 Dia (76mm) pc           2,804.00
GI Pipe Schedule 40 Dia (102mm) pc           4,118.79
GI Pipe Schedule 40 Dia (127mm) pc           7,973.22
GI Pipe Schedule 40 Dia (152mm) pc         10,667.75
Lumber Coco bdft                 18.56
Lumber Good bdft                 42.27
Milled Steel Plates Checked FY36 kg                 55.44
Milled Steel Plates FY36 kg                 54.39
Plyboard (0.019m x 1.2m x 2.44m) pc              907.93
Plyboard (0.025m x 1.2m x 2.44m) pc           1,103.45
Plywood Marine (0.00625m x 1.2m x 2.44m) pc              427.16
Plywood Marine (0.0125m x 1.2m x 2.44m) pc              794.74
Plywood Marine (0.019m x 1.2m x 2.44m) pc           1,211.26
Plywood Ordinary (0.0065m x 1.4 x 2.44m) pc              359.71
Plywood Ordinary (0.0125m x 1.4 x 2.44m) pc              658.07
Plywood Ordinary (0.019m x 1.4 x 2.44m) pc              990.46
Steel Deck sqm              855.41

These prices are calculated using cost-averaging formula. Some locations’ costs may be more expensive compared to the other. We simplified it this way for easy price updating.

To see all the material prices we have posted click here.

Please let us know how this blog helped you by subscribing, hitting like or share!

https://www.googletagmanager.com/gtag/js?id=UA-146841859-1