Region 7 – Metal Works Materials Prices

Common materials prices for truss works, steel-stairs and everything related to Metal Works for Region 7 (Bohol, Cebu, Negros Oriental and Siquijor). It also comes with corresponding prices of common hardware for steel works.

The price listed here are for pick-up prices only. Delivery costs, VAT and other extra charges are excluded.

METAL WORKS – REGION 7

MATERIALS DESCRIPTIONUNITPRICES (PhP)
Milled Steel Plates Checked FY36kg46.64
Milled Steel Plates FY36kg 46.64
Steel Sheet Stainlesskg 130.97
Bridge Rollers and Rockerspc4,616.09
Pins and Pin Holes FY60kg 76.75
Sliding Bearingkg 5,038.07
Structural Steel Angular Bar (A36)kg 57.09
Structural Steel Channel Bar (A36)kg 57.49
Structural Steel Square Bar (A36)kg 58.02
Structural Steel I-Beam (A36)kg 57.98
Strutural Steel Wide Flange (A36)kg 59.12
Rivets High Tensionkg 150.20
Washers High Tensionkg 186.84
Cork Expansion Joint Filler (.019m x 1.2m x 2.44m)pc664.30
Bolts High Tensionkg 155.82

HARDWARE – REGION 7

MATERIALS DESCRIPTIONUNITPRICES
Anchor Bolts w/ Nuts and Washerkg38.32
Machine Bolts w/ Nuts and Washerkg111.63
Tension Rods (38mm D)ln.ft.62.09
Tension Rods (16mm D)ln.ft. 28.97
Tension Rods (19mm D)ln.ft. 34.18
Turn Buckles (12.7mm D)pc131.14
Turn Buckles (16mm D)pc174.77
Turn Buckles (19mm D)pc239.04
W.I. Strapkg72.69
Hinge (50mm x 101mm)pr93.52
Door Locks (Schlage or Equivalent) set1,712.10
Automatic Door Closer (Yale or Equivalent)set2,662.02
Steel Cablekg124.67
Steel Grating Framekg90.13

Connect with us through Facebook!

Check other Metal Works Materials Prices from other Regions below

Cordillera Administrative Region

National Capital Region

Region 1

Region 2

Region 3

Region 4A (CALABARZON)

Region 4B (MIMAROPA)

Region 5

Region 6

Region 8

Region 9

Region 10

Region 11

Region 12

All amount in PhP. To see all the material prices we have posted click here.

Help us survive and continue on giving you useful information by donating here paypal.me/philconprices

Please let us know how this blog helped you by subscribing, hitting like or share!

Region 6 – Metal Works Materials Prices

Common materials prices for truss works, steel-stairs and everything related to Metal Works for Region 6 (Aklan, Antique, Negros Occidental, Capiz, Guimaras, and Ilo-ilo). It also comes with corresponding prices of common hardware for steel works.

The price listed here are for pick-up prices only. Delivery costs, VAT and other extra charges are excluded.

METAL WORKS – REGION 6

MATERIALS DESCRIPTIONUNITPRICES (PhP)
Milled Steel Plates Checked FY36kg58.99
Milled Steel Plates FY36kg 58.74
Steel Sheet Stainlesskg 185.83
Bridge Rollers and Rockerspc4,688.09
Pins and Pin Holes FY60kg 45.19
Sliding Bearingkg 5,004.04
Structural Steel Angular Bar (A36)kg 51.09
Structural Steel Channel Bar (A36)kg 51.09
Structural Steel Square Bar (A36)kg 54.60
Structural Steel I-Beam (A36)kg 55.94
Strutural Steel Wide Flange (A36)kg 54.54
Rivets High Tensionkg 156.83
Washers High Tensionkg 152.18
Cork Expansion Joint Filler (.019m x 1.2m x 2.44m)pc704.11
Bolts High Tensionkg 151.52

HARDWARE – REGION 6

MATERIALS DESCRIPTIONUNITPRICES
Anchor Bolts w/ Nuts and Washerkg38.84
Machine Bolts w/ Nuts and Washerkg110.83
Tension Rods (38mm D)ln.ft.40.01
Tension Rods (16mm D)ln.ft. 25.98
Tension Rods (19mm D)ln.ft. 32.16
Turn Buckles (12.7mm D)pc171.22
Turn Buckles (16mm D)pc181.20
Turn Buckles (19mm D)pc250.38
W.I. Strapkg67.64
Hinge (50mm x 101mm)pr71.37
Door Locks (Schlage or Equivalent) set1,623.07
Automatic Door Closer (Yale or Equivalent)set3,066.94
Steel Cablekg140.05
Steel Grating Framekg85.76

Connect with us through Facebook!

Check other Metal Works Materials Prices from other Regions below

Cordillera Administrative Region

National Capital Region

Region 1

Region 2

Region 3

Region 4A (CALABARZON)

Region 4B (MIMAROPA)

Region 5

Region 7

Region 8

Region 9

Region 10

Region 11

Region 12

All amount in PhP. To see all the material prices we have posted click here.

Help us survive and continue on giving you useful information by donating here paypal.me/philconprices

Please let us know how this blog helped you by subscribing, hitting like or share!

How to Typhoon-Proof Roofs in the Philippines

With the surprisingly strong typhoons that is visiting the country, it is just about time that Filipinos invest in properly built homes. We have seen and experienced how catastrophic Typhoon Odette was, that even big hotels and commercial establishments in Cebu, Bohol, Siargao and neighboring provinces were badly damaged.

Be prepared with whatever the future holds by stashing solar powered lights and charging techs you can use to recharge your smartphone! Check this link.

Philcon Prices – Sample House with Ongoing Roof Construction

If big establishments were severely disfigured, how much more the tiny residential ones? We hope the knowledge that we are going to share here, somehow help our Kababayans to build or rebuild strong roofs that is typhoon-proofed. A typical Filipino with a limited budget should know the things to consider to typhoon-proof their roofs and prevent it from getting flown by strong winds.

The sure way to typhoon-proof roofings are the following:

  • Get it designed by a professional.

You can never go wrong hiring one. Professionals are equipped with knowledge on how to design roofs the proper way. Instead of hiring “knowledgeable” labor to just decide things based on his “experiences”. Professional Architects and Engineers can do it best and is backed up with calculations to justify their designs.

  • Get it constructed by a legit contractor.

Properly designed plans is useless if not properly constructed. That’s the reason why there are “Designed Plans” and “As-built Plans” as mandated by our law. A legitimate contractor know how to read the plan and how to put it up based on proper engineering construction techniques.

  • Have the completed work inspected by a professional.

Quality control and assurance always accompany any infrastructure construction. That’s the reason why real state developers hire a person solely for quality control and assurance. This professional patrols and ensures the quality of the building in-behalf of the owner, since, owners normally don’t have the knowledge and intellect on building and construction.

Anyhow, we understand that there will always be fellow Filipinos who wouldn’t want to hire professionals because of monetary restrictions. If the things above are still out of budget, then please ensure that your roof will be construction with the things below in mind.

  • Properly tied or anchored trusses to the roof beam

Trusses, normally should bolted or tied into the column or roof beams. Base plates in between the truss and the column is placed for proper load distribution. Anchor bolts are placed in the column and is concreted together to ensure that it is rigid and firm.

  • Properly-welded, or bolted connections

Joints of each roof members, of course, should be properly executed. For wood roofing structure, bolts or metal straps are advised instead of nails as it is considered a weak support.

  • Use non-substandard materials

In the first place, substandard material should have never existed in the market. Always patronize business supplier that sells legitimate materials so those that trades substandard will not thrive.

  • Complete roofing accessories (Sagrods, Turnbuckles, Metal Straps etc.)

Roofing accessories which contribute to its ability to withstand heavy wind loads are often overlooked. Metal straps may be needed to roof trusses and is tied to walls. Sag rod is important to restrain the movement or deflection of purlins when subjected to load, also is often not considered.

Torn between buying a house from developers or just build it yourself? This guide will help you.

We’ve scouted a site with good customer reviews for their hand tools on this site, they ship nationwide!

Proper roof installation in the Philippines may be taken for granted especially for people who works just to get by day by day. It is sad that we have fellow countrymen who are still unable to consult and hire professional to construct their roofs. We hope that the guide above helped them somehow.

Researching on how much will it cost to add fixed outlets? Click here.

Help us survive and continue on giving you useful information by donating here paypal.me/philconprices

Please let us know how this blog helped you by subscribing, hitting like or share!

Price Guide to Adding Electrical Outlets and Circuit Breakers in the Philippines

For some reason, you may want to add fixed outlets in a certain location for you home. Say, you extended your home with additional bed room or, you may be a condo owner and you want to put outlets on that part of the wall. Below are the actual materials and costs we spent when we added additional fixed outlets in our condo unit.

Additional Fixed Wirings and Outlets Materials

We would like to add four outlets. Two sets for the workstation and two sets for the kitchen. Both were provided with a circuit breaker since the we are still undecided on where is the kitchen or the workstation on the two locations. Three outlets were inside the unit and one is in the terrace.

It is advisable to ask a professional on the capacity of the circuit breaker you’ll purchase since it depends on the appliances that it will cover.

The electrician we chose is experienced and professional. He did several projects with a Professional Electrical Engineer. We agreed on a fix rate of P400 per outlet and P400 per breaker. Meaning, for the four outlets and two circuit breakers, we incurred P2,400 on the labor cost. They provided all the power tools and the stairs needed to elevate themselves. They completed the work in around four hours.

We’ve found a well-known furniture shop with good reviews on this site, they ship nationwide!

Our condo unit has a total area of 24 sq.m. with dimensions of approximately 7.4m x 3.25m. Tiny one room it is. If you have larger room or house extension, you may need additional wires and/or molding.

Below is the breakdown of the materials and its corresponding costs as of December 2021. All based on mall price. (Price may vary per location, please check with your own local prices).

DescriptionQuantityCost per UnitTotal Cost (PhP)
PVC Moulding ¾”4 Lengths42.75141.00
Switch Box4 pcs49.75199.00
3 gang outlet,3 prong series4 sets199.75799.00
Circuit Breaker (30 Amp) Plug-in2 pcs400.00800.00
3.5mm THHN (Phelp Dodge)25 l.m.61.00 1,525.00
Masonry Drill Bit 1/8“1 pc49.0049.00
Weatherproof Outlet Cover1 pc190.00190.00
Electrical Tape – 3m Big Size1 pc56.0056.00
100 pcs Blind Rivets 1/8 x 1/21 box79.7579.57
Grand Total3,838.57

We opt to put the wirings outside the wall and just cover it with PVC molding so the work will be faster and to prevent dust, debris and concrete chips. We have already occupied the space and there are appliances and furniture.

Torn between building or just buying your own house? This will help you.

For those who want their additional outlets embedded inside the wall, you may need to pay additional concrete chipping tools and payment. You need additional cement for plastering works and painting materials for the painting works. You also would need PVC conduit, instead of molding, for your wires to be safe and secured beneath the wall. All which are not included on this post.

To summarize, the total amount we spend for the additional outlets were:

Materials: 3,838.57

Labor: P2,400.00

Total: 6,238.57

The output was good and we are satisfied. If you are sure that the electrician you are eyeing is knowledgeable and with a good track record, then you’re in safe hands, regardless the cost. Always get a professional advise if in doubt. You can never go wrong hiring one.

Researching on how to typhoon-proof your roofs? Click here.

Help us survive and continue on giving you useful information by donating here paypal.me/philconprices

Please let us know how this blog helped you by subscribing, hitting like or share!

Region 4B – Metal Works Materials Prices

Common materials prices for truss works, steel-stairs and everything related to Metal Works for Region 4B (Mindoro Occidental, Mindoro Oriental, Marinduque, Romblon and Palawan). It also comes with corresponding prices of common hardware for steel works.

The price listed here are for pick-up prices only. Delivery costs, VAT and other extra charges are excluded.

METAL WORKS – REGION 4B

MATERIALS DESCRIPTIONUNITPRICES (PhP)
Milled Steel Plates Checked FY36kg54.15
Milled Steel Plates FY36kg 46.61
Steel Sheet Stainlesskg 224.44
Bridge Rollers and Rockerspc5,121.84
Pins and Pin Holes FY60kg 80.44
Sliding Bearingkg 4,742.62
Structural Steel Angular Bar (A36)kg 52.03
Structural Steel Channel Bar (A36)kg 53.16
Structural Steel Square Bar (A36)kg 53.03
Structural Steel I-Beam (A36)kg 53.74
Strutural Steel Wide Flange (A36)kg 54.74
Rivets High Tensionkg 181.15
Washers High Tensionkg 191.15
Cork Expansion Joint Filler (.019m x 1.2m x 2.44m)pc647.18
Bolts High Tensionkg 152.37

HARDWARE – REGION 4B

MATERIALS DESCRIPTIONUNITPRICES
Anchor Bolts w/ Nuts and Washerkg43.38
Machine Bolts w/ Nuts and Washerkg109.77
Tension Rods (38mm D)ln.ft.60.84
Tension Rods (16mm D)ln.ft. 27.98
Tension Rods (19mm D)ln.ft. 32.16
Turn Buckles (12.7mm D)pc165.37
Turn Buckles (16mm D)pc180.39
Turn Buckles (19mm D)pc228.68
W.I. Strapkg62.65
Hinge (50mm x 101mm)pr70.11
Door Locks (Schlage or Equivalent) set1,580.27
Automatic Door Closer (Yale or Equivalent)set2,838.49
Steel Cablekg120.65
Steel Grating Framekg94.23

Connect with us through Facebook!

Check other Metal Works Materials Prices from other Regions below

Cordillera Administrative Region

National Capital Region

Region 1

Region 2

Region 3

Region 4A (CALABARZON)

Region 5

Region 6

Region 7

Region 8

Region 9

Region 10

Region 11

Region 12

All amount in PhP. To see all the material prices we have posted click here.

Help us survive and continue on giving you useful information by donating here paypal.me/philconprices

Please let us know how this blog helped you by subscribing, hitting like or share!

Region 4A – Metal Works Materials Prices

Common materials prices for truss works, steel-stairs and everything related to Metal Works for Region 4A CALABARZON (Cavite, Laguna, Batangas, Rizal and and Quezon). It also comes with corresponding prices of common hardware for steel works.

The price listed here are for pick-up prices only. Delivery costs, VAT and other extra charges are excluded.

METAL WORKS – REGION 4A

MATERIALS DESCRIPTIONUNITPRICES (PhP)
Milled Steel Plates Checked FY36kg49.16
Milled Steel Plates FY36kg 50.77
Steel Sheet Stainlesskg 120.71
Bridge Rollers and Rockerspc4,494.58
Pins and Pin Holes FY60kg 76.56
Sliding Bearingkg 4,267.58
Structural Steel Angular Bar (A36)kg 50.73
Structural Steel Channel Bar (A36)kg 51.57
Structural Steel Square Bar (A36)kg 50.73
Structural Steel I-Beam (A36)kg 58.59
Strutural Steel Wide Flange (A36)kg 58.57
Rivets High Tensionkg 150.38
Washers High Tensionkg 150.38
Cork Expansion Joint Filler (.019m x 1.2m x 2.44m)pc654.33
Bolts High Tensionkg 149.48

HARDWARE – REGION 4A

MATERIALS DESCRIPTIONUNITPRICES
Anchor Bolts w/ Nuts and Washerkg36.57
Machine Bolts w/ Nuts and Washerkg100.33
Tension Rods (38mm D)ln.ft.54.88
Tension Rods (16mm D)ln.ft. 25.98
Tension Rods (19mm D)ln.ft. 30.16
Turn Buckles (12.7mm D)pc158.50
Turn Buckles (16mm D)pc187.28
Turn Buckles (19mm D)pc231.52
W.I. Strapkg58.99
Hinge (50mm x 101mm)pr70.03
Door Locks (Schlage or Equivalent) set1,322.14
Automatic Door Closer (Yale or Equivalent)set2,005.80
Steel Cablekg120.42
Steel Grating Framekg83.01

Connect with us through Facebook!

Check other Metal Works Materials Prices from other Regions below

Cordillera Administrative Region

National Capital Region

Region 1

Region 2

Region 3

Region 4B (MIMAROPA)

Region 5

Region 6

Region 7

Region 8

Region 9

Region 10

Region 11

Region 12

All amount in PhP. To see all the material prices we have posted click here.

Help us survive and continue on giving you useful information by donating here paypal.me/philconprices

Please let us know how this blog helped you by subscribing, hitting like or share!

Region 3 – Metal Works Materials Prices

Common materials prices for truss works, steel-stairs and everything related to Metal Works for Region 3 (Aurora, Bataan, Bulacan, Nueva Ecija, Pampanga, Tarlac and Zambales). It also comes with corresponding prices of common hardware for steel works.

The price listed here are for pick-up prices only. Delivery costs, VAT and other extra charges are excluded.

METAL WORKS – REGION 3

MATERIALS DESCRIPTIONUNITPRICES (PhP)
Milled Steel Plates Checked FY36kg53.43
Milled Steel Plates FY36kg 66.34
Steel Sheet Stainlesskg 122.28
Bridge Rollers and Rockerspc4,678.31
Pins and Pin Holes FY60kg 80.60
Sliding Bearingkg 5,113.59
Structural Steel Angular Bar (A36)kg 61.15
Structural Steel Channel Bar (A36)kg 61.15
Structural Steel Square Bar (A36)kg 63.31
Structural Steel I-Beam (A36)kg 63.49
Strutural Steel Wide Flange (A36)kg 62.81
Rivets High Tensionkg 76.72
Washers High Tensionkg 75.77
Cork Expansion Joint Filler (.019m x 1.2m x 2.44m)pc670.91
Bolts High Tensionkg 154.92

HARDWARE – REGION 3

MATERIALS DESCRIPTIONUNITPRICES
Anchor Bolts w/ Nuts and Washerkg184.14
Machine Bolts w/ Nuts and Washerkg102.86
Tension Rods (38mm D)ln.ft.47.74
Tension Rods (16mm D)ln.ft. 24.88
Tension Rods (19mm D)ln.ft. 32.38
Turn Buckles (12.7mm D)pc147.43
Turn Buckles (16mm D)pc163.74
Turn Buckles (19mm D)pc235.53
W.I. Strapkg62.56
Hinge (50mm x 101mm)pr64.22
Door Locks (Schlage or Equivalent) set1,711.95
Automatic Door Closer (Yale or Equivalent)set1,418.61
Steel Cablekg124.97
Steel Grating Framekg88.56

Connect with us through Facebook!

Check other Metal Works Materials Prices from other Regions below

Cordillera Administrative Region

National Capital Region

Region 1

Region 2

Region 4A – CALABARZON

Region 4B – MIMAROPA

Region 5

Region 6

Region 7

Region 8

Region 9

Region 10

Region 11

Region 12

All amount in PhP. To see all the material prices we have posted click here.

Help us survive and continue on giving you useful information by donating here paypal.me/philconprices

Please let us know how this blog helped you by subscribing, hitting like or share!

Region 2 – Metal Works Materials Prices

Common materials prices for truss works, steel-stairs and everything related to Metal Works for Region 2 (Cagayan Valley, Isabela, Nueva Viscaya, Batanes and Quirino). It also comes with corresponding prices of common hardware for steel works.

The Island of Batanes ramps up the calculation of average materials prices for Region 2. Construction materials costs in the Island of Batanes is considerably higher compared to the rest of the provinces because of its location.

The price listed here are for pick-up prices only. Delivery costs, VAT and other extra charges are excluded.

METAL WORKS – REGION 2

MATERIALS DESCRIPTIONUNITPRICES (PhP)
Milled Steel Plates Checked FY36kg61.33
Milled Steel Plates FY36 kg 64.49
Steel Sheet Stainless kg 119.98
Bridge Rollers and Rockerspc4,584.69
Pins and Pin Holes FY60 kg 83.58
Sliding Bearing kg 5,082.98
Structural Steel Angular Bar (A36) kg 75.94
Structural Steel Channel Bar (A36) kg 74.94
Structural Steel Square Bar (A36) kg 73.72
Structural Steel I-Beam (A36) kg 76.72
Strutural Steel Wide Flange (A36) kg 76.18
Rivets High Tension kg 73.18
Washers High Tension kg 74.18
Cork Expansion Joint Filler (.019m x 1.2m x 2.44m)pc714.90
Bolts High Tension kg 141.12

HARDWARE – REGION 2

MATERIALS DESCRIPTIONUNITPRICES
Anchor Bolts w/ Nuts and Washerkg41.25
Machine Bolts w/ Nuts and Washerkg105.15
Tension Rods (38mm D)ln.ft.50.08
Tension Rods (16mm D)ln.ft. 22.44
Tension Rods (19mm D)ln.ft. 30.10
Turn Buckles (12.7mm D)pc163.50
Turn Buckles (16mm D)pc187.23
Turn Buckles (19mm D)pc238.24
W.I. Strapkg61.95
Hinge (50mm x 101mm)pr67.66
Door Locks (Schlage or Equivalent) set1,542.71
Automatic Door Closer (Yale or Equivalent)set1,990.73
Steel Cablekg123.74
Steel Grating Framekg87.13

Connect with us through Facebook!

Check other Metal Works Materials Prices from other Regions below

Cordillera Administrative Region

National Capital Region

Region 1

Region 3

Region 4A – CALABARZON

Region 4B – MIMAROPA

Region 5

Region 6

Region 7

Region 8

Region 9

Region 10

Region 11

Region 12

All amount in PhP. To see all the material prices we have posted click here.

Help us survive and continue on giving you useful information by donating here paypal.me/philconprices

Please let us know how this blog helped you by subscribing, hitting like or share!

Region 1 – Metal Works Materials Prices

Common materials prices for truss works, steel-stairs and everything related to Metal Works for Region 1 (Ilocos Norte, Ilocos Sur, La Union and Pangasinan). It also comes with corresponding prices of common hardware for steel works.

The price listed here are for pick-up prices only. Delivery costs, VAT and other extra charges are excluded.

METAL WORKS – REGION 1

MATERIALS DESCRIPTIONUNITPRICES (PhP)
Milled Steel Plates Checked FY36kg50.51
Milled Steel Plates FY36 kg 52.16
Steel Sheet Stainless kg 121.56
Bridge Rollers and Rockerspc4,508.18
Pins and Pin Holes FY60 kg 74.71
Sliding Bearing kg 5,006.03
Structural Steel Angular Bar (A36) kg 54.27
Structural Steel Channel Bar (A36) kg 54.78
Structural Steel Square Bar (A36) kg 54.78
Structural Steel I-Beam (A36) kg 52.78
Strutural Steel Wide Flange (A36) kg 52.78
Rivets High Tension kg 151.89
Washers High Tension kg 150.78
Cork Expansion Joint Filler (.019m x 1.2m x 2.44m)pc651.96
Bolts High Tension kg 150.62

HARDWARE – REGION 1

MATERIALS DESCRIPTIONUNITPRICES
Anchor Bolts w/ Nuts and Washerkg35.39
Machine Bolts w/ Nuts and Washerkg98.58
Tension Rods (38mm D)ln.ft.31.86
Tension Rods (16mm D)ln.ft. 21.15
Tension Rods (19mm D)ln.ft. 29.16
Turn Buckles (12.7mm D)pc161.03
Turn Buckles (16mm D)pc189.06
Turn Buckles (19mm D)pc231.69
W.I. Strapkg60.07
Hinge (50mm x 101mm)pr65.06
Door Locks (Schlage or Equivalent) set1,568.57
Automatic Door Closer (Yale or Equivalent)set2,803.58
Steel Cablekg121.25
Steel Grating Framekg83.24

Connect with us through Facebook!

Check other Metal Works Materials Prices from other Regions below

Cordillera Administrative Region

National Capital Region

Region 2

Region 3

Region 4A – CALABARZON

Region 4B – MIMAROPA

Region 5

Region 6

Region 7

Region 8

Region 9

Region 10

Region 11

Region 12

All amount in PhP. To see all the material prices we have posted click here.

Help us survive and continue on giving you useful information by donating here paypal.me/philconprices

Please let us know how this blog helped you by subscribing, hitting like or share!

NCR – Metal Works Materials Prices

Common materials prices for truss works, steel-stairs and everything related to Metal Works for National Capital Region. It also comes with corresponding prices of common hardware for steel works.

The price listed here are for pick-up prices only. Delivery costs, VAT and other extra charges are excluded.

METAL WORKS – NATIONAL CAPITAL REGION

MATERIALS DESCRIPTIONUNITPRICES (PhP)
Milled Steel Plates Checked FY36kg45.03
Milled Steel Plates FY36 kg 40.84
Steel Sheet Stainless kg 117.22
Bridge Rollers and Rockerspc4,482.12
Pins and Pin Holes FY60 kg 74.68
Sliding Bearing kg 4,990.61
Structural Steel Angular Bar (A36) kg 44.88
Structural Steel Channel Bar (A36) kg 44.88
Structural Steel Square Bar (A36) kg 44.88
Structural Steel I-Beam (A36) kg 44.19
Strutural Steel Wide Flange (A36) kg 49.53
Rivets High Tension kg 148.17
Washers High Tension kg 148.17
Cork Expansion Joint Filler (.019m x 1.2m x 2.44m)pc638.51
Bolts High Tension kg 148.78

HARDWARE – NATIONAL CAPITAL REGION

MATERIALS DESCRIPTIONUNITPRICES
Anchor Bolts w/ Nuts and Washerkg35.30
Machine Bolts w/ Nuts and Washerkg93.64
Tension Rods (38mm D)ln.ft.37.39
Tension Rods (16mm D)ln.ft. 23.01
Tension Rods (19mm D)ln.ft. 28.64
Turn Buckles (12.7mm D)pc159.31
Turn Buckles (16mm D)pc179.92
Turn Buckles (19mm D)pc227.46
W.I. Strapkg58.74
Hinge (50mm x 101mm)pr68.11
Door Locks (Schlage or Equivalent) set1,306.75
Automatic Door Closer (Yale or Equivalent)set2,078.13
Steel Cablekg117.63
Steel Grating Framekg83.26

Connect with us through Facebook!

Check other Metal Works Materials Prices from other Regions below

Cordillera Administrative Region

Region 1

Region 2

Region 3

Region 4A – CALABARZON

Region 4B – MIMAROPA

Region 5

Region 6

Region 7

Region 8

Region 9

Region 10

Region 11

Region 12

All amount in PhP. To see all the material prices we have posted click here.

Help us survive and continue on giving you useful information by donating here paypal.me/philconprices

Please let us know how this blog helped you by subscribing, hitting like or share!

https://www.googletagmanager.com/gtag/js?id=UA-146841859-1