The Real Cost of Building a House in the Philippines (2025 Guide)

Cost to build a house 2025

Building a house in the Philippines is a major financial commitment, and the cost varies significantly depending on several factors. Whether you’re working with a tight budget or planning for a luxury home, it’s essential to understand where your money goes. In this post, we will break down bits-to-bits the real cost to build a house in the Philippines 2025.

Check our new interactive House Construction Cost Estimator Here!

Is ₱1M enough? Or do you need ₱5M+? Let’s break down the real cost of house construction in the Philippines in 2025.

Well you see, there are several factors that affect construction costs. To be honest, creating a post like this is tricky. It is difficult to fully explain it through a simple blog post. But, we will try to be simple as we can.

We will dive down into the most obvious factors that affect house construction costs.

If you are looking for the construction cost to build rental properties, click here.

Factors That Affect House Construction Costs

1. Location

  • Metro Manila vs. Provinces – Construction costs in urban areas like Metro Manila, Cebu City and Davao City are generally higher due to expensive land prices and labor rates.
  • Provincial Areas – In less urbanized areas, labor and material costs tend to be lower. But, understand that the farther the location to urban areas, the higher the construction material delivery cost is.

2. Lot Size and Type

  • If you already own land, you’ll save a significant portion of your budget.
  • Land prices vary depending on the area, with premium locations in highly urbanized area costing more per square meter.

3. House Size and Design

  • A bungalow is usually more affordable than a multi-story home because of reduced structural requirements.
  • Modern designs with open layouts may require higher-quality materials, increasing costs.

Check out this highly recommended and coveted home tools we’ve found in Shopee!

📌 Top star rated solar lamps >> Click Here!

📌 Restaurant and Hotel Like Decors >> Click Here!

📌 Disaster Emergency Kit >> Click Here!

4. Materials Used

House TypeCost per SQMMaterials Used
Low-CostP15,000 – 25,000Basic finishes with locally sourced materials.
Mid-RangeP26,000 – 45,000Higher durability and semi-luxury materials
High-EndP46,000+Premium and imported materials, smart home features, and customized designs for comfort.

5. Labor Costs

By labor cost, we mean all the people that you need to build your house. From the actual manpower to the professional technical people. There are two options you can go about.

  • Hiring a Contractor – Preferably a design and build contractors are more convenient option but typically costs 20-30% more.
  • Direct Hiring Workers – A cheaper alternative, but requires hands-on supervision. You’ll still need to hire professional architects and engineers to design your house. You’ll also need to hire professionals to inspect workers output per project milestone. Supervising and checking your laborers output day-by-day may be a tremendous work, but, you can save a lot.

6. Permits & Fees

  • Building Permits and Plans – Costs vary per municipality but typically range from ₱20,000 – ₱100,000. Typically, this is included in the design phase by the Architect (signing of all the professionals needed for the house design). Take note that “For Construction Plans” are different from the “As Built Plans”. See differences below.
For Construction PlansAs-Built Plans
Plans created before construction.Plans created after construction.
Guide contractors on how to build the project according to the intended design.Reflect any changes, modifications, or deviations made during the construction process compared to the original plans
Shows what is intended to build.Show what was actually built.

By the way, the professional fees for these two different set of plans, are paid differently. It is important to discuss these to your hired professionals.

Design and build contractors normally has these two sets of professional. This is also one of the reason why design and build contractors are better than direct hiring of worker as discussed above.

  • Legal Fees & Taxes – Includes land title registration, notarization, and other government fees. You will go through this on your own if you opted to do-it-yourself. Mind you, this is not an easy task.

To give you a better grasp on the house construction cost, we will give you a sample house construction breakdown for the three house tiers, the low-cost, the mid-range, and the high-end with cost estimates. Unfortunately, we cannot give you the approximate house area as the plans varies.

The home construction cost breakdown above are just guides. To help you visualize its breakdown. If ever there are portion of this post that don’t coincide with your trusted contractor or professional, then, your contractor’s numbers should prevail.

Hidden Costs to Watch Out For

Even after estimating your construction cost, don’t forget about these additional expenses:

  • Landscaping – If this is included in your contract, the better. If it not and you want to do-it-yourself, you better check real-time local prices as this can get pricey.
  • Furniture, Equipment, & Interior Design – Custom cabinetry, appliances, and decor.
  • Unexpected Construction Delays – Weather, permit issues, or material shortages. Well, if you hire the reputable contractor, then you wouldn’t really bother about this.
  • Inflation & Rising Material Costs –. If you are the one to buy some of the materials, like steel and cement, you better buy this in bulk. Prices of cement, steel, and wood fluctuate yearly.

Additional Key Points

  1. Be sure to include in your contract a clause for liquidated damages – in case the house completion is delayed because of the contractor’s fault. For example, shortage of manpower, or construction tools/ equipment delays. Acts of God causes of delays like earthquakes and the likes, oftentimes, are not part of contractor’s liability.
  2. Budget for Soil Testing & Unexpected Site Conditions – Many people forget that soil testing and unexpected ground conditions (like rocky soil or poor drainage) can add to costs significantly.
  3. Probable active fault like or seismic activities in your land properties. With earthquake activities here and there, better seek professional advise about probable seismic activities in or near your land properties.
  4. Waste Management & Cleanup Costs – Be sure to also include a clause about disposing of construction debris, renting waste bins, and cleaning up after construction can be costly if not planned for.

You may also want to get equipped with the things to inspect/check before your next real estate deal. Read more here.

Building a house is a major investment, and understanding the real costs involved can save you from unexpected surprises. Whether you’re planning a low-cost, mid-range, or high-end home, careful budgeting and smart decisions will help you maximize your investment.

Stay updated with construction material prices, labor costs, and hidden fees to make informed choices. And remember—working with reliable contractors and a solid cost plan can prevent costly mistakes.

📌 Are you a student? Need more insights on home construction? Explore our other guides and cost breakdowns.

📢 Have questions or experiences to share? Drop a comment below!

Disclaimer:

We do not warrant that the information on this website is correct, complete, or accurate; nor do we promise to ensure that the website and its content remains up-to-date. If there are portion of this post that do not coincide with your local contractor or professional, the contractor or professional advise always prevails.

Construction Cost Comparison: Low-Cost vs. Mid-Range Homes

A lot of people sends us a message about house construction cost, for both low-cost construction and mid-range construction cost. To hit two birds with one stone, we have a created this post comparing the two common housing tiers.

Check our new interactive House Construction Cost Estimator Here!

If you are looking for back-to-back comparison for Low-Cost, Mid-Range, and High-end houses all in 2025, click here.

Building a home is one of the biggest financial decisions you’ll ever make. But with so many options and price points, how do you know whether a low-cost home will meet your needs or if a mid-range build is worth the extra investment? Or perhaps, you would only need a little bit of extra money that is still on-point with your budget to get that mid-range house. Let’s check it out in this post.

The house plan we will talk into is reflected on the floor plan below. Approximately 115 sq.m. area for both ground and second floor.

Ground floor plan and second floor plan sample.

As always, there will always be a disclaimer. These construction prices in the next paragraph are just average construction cost. It will always vary on the site location, availability of construction materials, and the labor cost in your respective area. If ever there are portion of this post that don’t coincide with your trusted contractor, then, your contractor’s numbers should prevail.

We will also dive down into an actual construction cost breakdown so you will have an idea about it’s price differences. But before that, we need to know the basic characteristics of comparison between low-cost houses and mid-cost houses.

This analysis breaks down the house construction cost differences between low-cost and mid-range housing, comparing expenses in overall project budget (costs includes both materials, labor, and equipment).

DescriptionLow-Cost HousesMid-Range Houses
Budget15,000 – 25,000 Php / SQM, focuses on savings26,000 – 45,000 Php / SQM, better materials and finishes
Materials UsedBasic Material, Tin/GI roofing, plywood, cheaper materials used and paint finishes.Higher quality materials (e.g., concrete blocks, reinforced foundations, better insulation, higher-grade tiles, and paints)
Durability & LongevityShorter lifespan and may require frequent repairs More durable construction, better resistance to wear and weather conditions
Design and Aesthetic AppealSimple but functional, with minimal architectural detailsMore stylish, better layout, larger windows, enhanced curb appeal
Resale ValueLower resale value due to basic construction and possible wear and tearHigher resale value because of better quality and appeal.

For simplicity, we used the 115 SQM area house reference for both house tiers (floor plan above). The bill of quantity for both houses are also presented in such a away that it is easy for them to be compared.

We did not include high-end houses because it is unlikely that high-ends units will only have 115 sq.m. area as floor area. We will create a different post showing differences for the three house tiers, low-cost, mid-range, and high-ends units. So subscribe to keep posted.

In the price differentiation between low-cost and mid-cost construction cost, take note that the structural concrete division, the two house tiers are basically similar. We assumed that the house is in similar location and soil condition. Thus, it’s structural need is also identical. Normally, it is in the architectural trade that determine the cost of the house. Actually, architectural trade and aesthetic dictates the housing cost. Some home owners would not want certain columns in-centers. Hence, making the structural columns at the corner more reinforcement demanding. For simplicity, we will assume identical structural needs for this house.

Below, you will find the back-to-back house building cost comparison of the two typical tier houses, the low-cost houses, and the mid-range houses. To avoid complexity, indirect costs, contractor’s profit, and other miscellaneous is included in the numbers.

Everything is updated to date. You see, the following are the differences between low-cost and mid-range. In the attached bill of quantity, you will see the approximate building expenses between low cost housing and mid range housing costs. The brief summary of materials to be used is also included.

We would also like to highlight the per area construction costs.

These days, the decent entry level or low cost housing construction cost per square meter is around 15k-25k, while the mid-range housing construction cost per square meter is 26k-45k. Although some can still build below 15k (others can even do it at 10,000 – 13,000). But, its quality and integrity are shady and is not that good, Meaning, it requires frequent housing maintenance.

We found the perfect heavy duty solar lighting for your house needs. Check it here!

Most contractors and builders uses this per square area, or per square meter in computing the building cost of the house for simplicity.

To get the “approximate” total construction costs, simply multiply the floor area of the house x the price range (that is 15k-25k for low-cost, and 26k-45k for mid-range). If there are two floors, add the ground floor area and the second floor area to get the total floor area, then multiply it to the price range.

Take note of the word “approximate” as this is only just an average. You cannot get the actual construction cost unless you already have the final house plan and contract in place. Also, don’t confuse these numbers with the developed lands offered by housing developers. Developed subdivision housing often have amenities which adds to the housing costs.

If you are looking for some references for house extension costs, click here.

Connect with us through Facebook!

If this post has helped you in any way, please help us survive and continue on giving you useful information by donating here paypal.me/philconprices

Please let us know how this blog helped you by subscribing, hitting like or share!

Region 5 – Sanitary and Plumbing Material Prices

PLUMBING AND FIXTURES
Region V
Material Description Unit  Ave. Price (Php)
Water Closet Including Fittings and Acc. (Elongated) American STD or Equivalent set               6,659.92
Water Closet Including Fittings and Acc. (Round) American STD or Equivalent set               4,501.95
Lavatory Including Fittings and Acc. American STD or Equivalent set               5,882.08
Urinal Including Fittings and Acc. American STD or Equivalent set               4,358.46
Bronze Faucets (12.7mm D) pc                  150.96
G.I. Pipes (12.7mm D) pc                  407.51
G.I. Pipes (19mm D) pc                  509.45
G.I. Pipes (25.4mm D) pc                  885.44
G.I. Pipes (38mm D) pc               1,442.69
G.I. Pipes (50mm D) pc               1,951.90
G.I. Pipes (63mm D) pc               3,046.28
G.I. Pipes (76mm D) pc               4,057.34
G.I. Pipes (89mm D) pc               5,313.13
G.I. Pipes (101mm D) pc               6,036.67
G.I. Coupling Elbow (12.7mm D) pc                    15.29
G.I. Coupling Elbow (19mm D) pc                    19.80
G.I. Coupling Elbow (25.4mm D) pc                    22.94
G.I. Coupling Elbow (38mm D) pc                    26.57
G.I. Coupling Elbow (50mm D) pc                    49.10
G.I. Coupling Elbow (63mm D) pc                    74.38
G.I. Coupling Elbow (76mm D) pc                    79.01
G.I. Coupling Elbow (89mm D) pc                    98.53
G.I. Coupling Elbow (101mm D) pc                  122.68
G.I. Tee, Banded (12.7mm D) pc                    23.36
G.I. Tee, Banded (19mm D) pc                    24.50
G.I. Tee, Banded (25.4mm D) pc                    27.82
G.I. Tee, Banded (38mm D) pc                    60.42
G.I. Tee, Banded (50mm D) pc                    62.26
G.I. Tee, Banded (63mm D) pc                    74.73
G.I. Tee, Banded (76mm D) pc                    79.96
G.I. Tee, Banded (101mm D) pc                  169.88
G.I. Caps,  Banded (12.7mm D) pc                    14.49
G.I. Caps, Banded (19mm D) pc                    42.64
G.I. Caps, Banded (25.4mm D) pc                    46.22
G.I. Caps, Banded (38mm D) pc                    56.55
G.I. Caps, Banded (50mm D) pc                    60.94
G.I. Caps, Banded (63mm D) pc                    68.04
G.I. Caps, Banded (76mm D) pc                  120.89
G.I. Caps, Banded (101mm D) pc                  218.60
G.I. Plugs (12.7mm D) pc                    23.26
G.I. Plugs (19mm D) pc                    27.46
G.I. Plugs (25.4mm D) pc                    28.09
G.I. Plugs (38mm D) pc                    28.98
G.I. Plugs (50mm D) pc                    36.00
G.I. Plugs (63mm D) pc                    36.36
G.I. Plugs (76mm D) pc                    57.13
G.I. Plugs (101mm D) pc                    60.86
G.I. Unions, Flat Seat (12.7mm D) pc                    32.48
G.I. Unions, Flat Seat (19mm D) pc                    37.41
G.I. Unions, Flat Seat (25.4mm D) pc                    75.67
G.I. Unions, Flat Seat (38mm D) pc                    91.77
G.I. Unions, Flat Seat (50mm D) pc                  111.09
G.I. Unions, Flat Seat (63mm D) pc                  145.25
G.I. Unions, Flat Seat (76mm D) pc                  220.11
G.I. Unions, Flat Seat (101mm D) pc                  354.66
G.I. Reducer (12.7mm D) pc                    19.32
G.I. Reducer (19mm D) pc                    21.33
G.I. Reducer (25.4mm D) pc                    25.56
G.I. Reducer (38mm D) pc                    33.81
G.I. Reducer (50mm D) pc                    57.96
G.I. Reducer (63mm D) pc                    67.62
G.I. Reducer (76mm D) pc                    71.29
G.I. Reducer (101mm D) pc                    86.94
PVC Pipes (12.7mm D) pc                    62.65
PVC Pipes (19mm D) pc                    84.83
PVC Pipes (25.4mm D) pc                  101.43
PVC Pipes (38mm D) pc                  199.76
PVC Pipes (50mm D) pc                  291.29
PVC Pipes (63mm D) pc                  321.68
PVC Pipes (76mm D) pc                  422.96
PVC Pipes (89mm D) pc                  558.80
PVC Pipes (101mm D) pc                  603.53
PVC Coupling (12.7mm D) pc                      8.61
PVC Coupling (19mm D) pc                    10.55
PVC Coupling (25.4mm D) pc                    15.23
PVC Coupling (38mm D) pc                    16.68
PVC Coupling (50mm D) pc                    32.05
PVC Coupling (63mm D) pc                    38.19
PVC Coupling (76mm D) pc                    56.35
PVC Coupling (89mm D) pc                    57.83
PVC Coupling (101mm D) pc                    73.16
PVC Tee (12.7mm D) pc                      7.73
PVC Tee (19mm D) pc                    10.19
PVC Tee (25.4mm D) pc                    14.14
PVC Tee (38mm D) pc                    32.58
PVC Tee (50mm D) pc                    38.02
PVC Reducer (19mm x 12.7mm) pc                      7.21
PVC Reducer (25.4mm x 19mm) pc                    19.40
PVC Reducer (25.4mm x 12.7mm) pc                    10.63
PVC Reducer (38mm x 25.4mm) pc                    48.44
PVC Reducer (38mm x 19mm) pc                    38.77
PVC Reducer (50mm x 25.4mm) pc                    57.96
PVC 45deg. (3mm bend x 50mm) pc                    22.04
PVC 45deg. (3mm bend x 76mm) pc                    38.32
PVC 45deg. (3mm bend x 101mm) pc                    59.89
PVC 87.deg. (6mm bend x 50mm) pc                    26.73
PVC 87.deg. (6mm bend x 76mm) pc                    50.72
PVC 87.deg. (6mm bend x 101mm) pc                    80.03
PVC 45deg. Single Branch, WYE (50mmx 50 mm) pc                    78.66
PVC 45deg. Single Branch, WYE (76mmx 50 mm) pc                    86.04
PVC 45deg. Single Branch, WYE (76mmx 76 mm) pc                    87.42
PVC 45deg. Single Branch, WYE (101mmx 50 mm) pc                    97.83
PVC 45deg. Single Branch, WYE (101mmx 76 mm) pc                  118.82
PVC 45deg. Single Branch, WYE (101mmx 101 mm) pc                  124.35
PVC 87.5deg. Single Branch, SEEP, TEE (50mm x 50mm) pc                    38.04
PVC 87.5deg. Single Branch, SEEP, TEE  (76mmx 50 mm) pc                    94.60
PVC 87.5deg. Single Branch, SEEP, TEE  (76mmx 76 mm) pc                    98.34
PVC 87.5deg. Single Branch, SEEP, TEE  (101mmx 50 mm) pc                  110.40
PVC 87.5deg. Single Branch, SEEP, TEE  (101mmx 76 mm) pc                  126.14
PVC 87.5deg. Single Branch, SEEP, TEE  (101mmx 101 mm) pc                  133.39
PVC Double Branch, Tee (50mm) pc                    72.96
PVC Double Branch, Tee (76mm) pc                  167.96
PVC Double Branch, Tee (101mm) pc                  259.72
PVC P-trap w/ Plug & Sealing Ring (50mm) pc                  106.95
PVC P-trap w/ Plug & Sealing Ring (76mm) pc                  193.65
PVC P-trap w/ Plug & Sealing Ring (101mm) pc                  270.48
PVC Clean-out w/ Plug & Sealing Ring (50mm) pc                    22.35
PVC Clean-out w/ Plug & Sealing Ring (76mm) pc                    36.79
PVC Clean-out w/ Plug & Sealing Ring (101mm) pc                    59.00
PVC Concentric Bushing Reducer (76mm x 50mm) pc                    32.33
PVC Concentric Bushing Reducer (101mm x 50mm) pc                    48.44
PVC Concentric Bushing Reducer (101mm x 76mm) pc                    52.85
PVC Male Threaded Adaptor (12.7mm) pc                      7.38
PVC Male Threaded Adaptor (19mm) pc                      8.78
PVC Male Threaded Adaptor (25.4mm) pc                    13.09
PVC Male Threaded Adaptor (38mm) pc                    24.47
PVC Male Threaded Adaptor (50mm) pc                    41.71
PVC 87.5deg. Sanitary Tap Tee w/ Seal Ring (50mm x 25.4mm) pc                    87.65
PVC 87.5deg. Sanitary Tap Tee w/ Seal Ring (50mm x 38mm) pc                    87.07
Shower Head w/ Valve pc               1,872.88
Soap Holder set               1,335.29
Cylindrical Water Tank (500 gals) set            16,093.70
Stainless Ladder Rung kg                  164.67
Kitchen Sink set               4,857.73
Floor Drain pc                  282.52
Paper Holder set               1,209.02
Mirror sqft                    87.07
Gate Valve 25mm Dia pc                  388.33
Union Patentee 13mm Dia pc                    33.40
Water Meter pc               1,165.45
Solvent can                  186.76
Tefflon Tape roll                      9.42
GI Nipple 13mm Dia pc                    22.22

VAT not included.

To see all the material prices we have posted click here.

Please let us know how this blog helped you by subscribing, hitting like or share!

Swimming Pool Accessories Price Guide

This is a construction price guide for building a swimming pool. The earthworks, structural and architectural were not included.

PLUMBING & EQUIPMENT
 Description Unit Qty  Materials  Labor  Other  Total (Php)
Supply and install valves, pipings, fittings and other items as necessary  Lot            1.00     103,700.00     31,110.00    37,746.80     172,556.80
Centrifugal pump/motor 2HP, 230v  Item            1.00       41,480.00       3,050.00    12,468.40       56,998.40
Sand Filter 360T2  w/ Multiport Valve  Item            1.00       73,200.00       3,050.00    21,350.00       97,600.00
Maindrain Cover  Item            1.00         1,830.00          366.00         614.88         2,810.88
Vacum Fittings  Item            2.00            732.00       1,830.00         717.36         6,558.72
Return Fittings  Item            4.00            732.00          152.50         247.66         4,528.64
Vacuum cleaning set  Item            2.00       18,300.00       1,830.00      5,636.40       51,532.80
Hydrostatic relief valve  Item            1.00         1,708.00          366.00         580.72         2,654.72
    395,240.96
 ELECTRICAL & UNDERWATER LIGHTS
 Description Unit Qty  Materials  Labor  Other  Total (Php)
Underwater Light  12v  Item            8.00       17,080.00       1,464.00      5,192.32     189,890.56
Mounting Ring  Item            8.00         1,708.00          512.40         621.71       22,736.90
Deck Box  Item            6.00         1,098.00          244.00         375.76       10,306.56
Transformer 300w / 12-16 v  Item            4.00         3,660.00          610.00      1,195.60       21,862.40
Conduits 3/4″ diameter  lot            1.00       18,300.00       5,490.00      6,661.20       30,451.20
#10 Wire  lot            1.00       36,600.00     10,980.00    13,322.40       60,902.40
Panel Board  Item            1.00       18,300.00       1,830.00      5,636.40       25,766.40
Magnetic Switch  Item            1.00         3,904.00          610.00      1,263.92         5,777.92
Push Botton Switches  Item            4.00            610.00          146.40         211.79         3,872.77
    371,567.10
 OTHER WORKS
 Description Unit Qty  Materials  Labor  Other  Total (Php)
Construction of balancing tank  Item            1.00     140,300.00     42,090.00    51,069.20     233,459.20
Construction of filtration room  Item            1.00     140,300.00     42,090.00    51,069.20     233,459.20
Supply of water line from sourec to pump room using PVC pipes  item            1.00       21,960.00       6,588.00      7,993.44       36,541.44
Supply of power from source to pump room. Tapping not included  item            1.00       30,500.00       30,500.00
Testing & Commissioning  item            1.00       18,300.00       5,490.00      6,661.20       30,451.20
One month maintenance  item            1.00       12,200.00       6,100.00      5,124.00       23,424.00
    587,835.04

To see all the material prices we have posted click here.

Looking for a material breakdown per area for painting works? Click this link. Or perhaps  this Tiling Works Materials Breakdown is the one you are searching for.

Please let us know how this blog helped you by subscribing, hitting like or share!

https://www.googletagmanager.com/gtag/js?id=UA-146841859-1