Mindanao Metal Roofing Prices

MINDANAO – Metal Roofing Prices
Material Description Unit  Amount (PhP)
Pre-painted Long Span Metal Roofing Sheet, GA 26 SQ.M.               465.97
Pre-painted Metal Roofing Sheet, GA 26 x 2.44m SQ.M.               491.76
Corrugated Roofing, GA 26 – 0.51mm x 2.44m SQ.M.               360.63
Pre-painted Gutter, GA 24 – 0.701mm x 2.44m l.m.               268.05
Ordinary Gutter, GA 24 – 0.701mm x 2.44m l.m.               162.04
Pre-painted Flashing, GA 24 – 0.701mm x 2.44m l.m.               269.73
Ordinary Flashing, GA 24 – 0.701mm x 2.44m l.m.               156.72
Pre-painted Ridge Roll, GA 24 – 0.701mm x 2.44m l.m.               264.34
Ordinary Ridge Roll, GA 24 – 0.701mm x 2.44m l.m.               155.86
Roof Ventilators set            1,370.23

These prices are calculated using cost-averaging formula. Some locations’ costs may be more expensive compared to the other. We simplified it this way for easy price updating.

To see all the material prices we have posted click here.

Please let us know how this blog helped you by subscribing, hitting like or share

Visayas Metal Roofing Prices

VISAYAS – Metal Roofing Prices
Material Description Unit  Amount (PhP)
Pre-painted Long Span Metal Roofing Sheet, GA 26 SQ.M.               506.11
Pre-painted Metal Roofing Sheet, GA 26 x 2.44m SQ.M.               431.99
Corrugated Roofing, GA 26 – 0.51mm x 2.44m SQ.M.               304.83
Pre-painted Gutter, GA 24 – 0.701mm x 2.44m l.m.               245.73
Ordinary Gutter, GA 24 – 0.701mm x 2.44m l.m.               151.72
Pre-painted Flashing, GA 24 – 0.701mm x 2.44m l.m.               223.30
Ordinary Flashing, GA 24 – 0.701mm x 2.44m l.m.               150.10
Pre-painted Ridge Roll, GA 24 – 0.701mm x 2.44m l.m.               246.37
Ordinary Ridge Roll, GA 24 – 0.701mm x 2.44m l.m.               155.11
Roof Ventilators set            1,304.52

These prices are calculated using cost-averaging formula. Some locations’ costs may be more expensive compared to the other. We simplified it this way for easy price updating.

To see all the material prices we have posted click here.

Please let us know how this blog helped you by subscribing, hitting like or share

Luzon Metal Roofing Prices

LUZON – Metal Roofing Prices
Material Description Unit  Amount (PhP)
Pre-painted Long Span Metal Roofing Sheet, GA 26 SQ.M.               397.02
Pre-painted Metal Roofing Sheet, GA 26 x 2.44m SQ.M.               384.65
Corrugated Roofing, GA 26 – 0.51mm x 2.44m SQ.M.               258.80
Pre-painted Gutter, GA 24 – 0.701mm x 2.44m l.m.               191.50
Ordinary Gutter, GA 24 – 0.701mm x 2.44m l.m.               120.86
Pre-painted Flashing, GA 24 – 0.701mm x 2.44m l.m.               187.54
Ordinary Flashing, GA 24 – 0.701mm x 2.44m l.m.               117.11
Pre-painted Ridge Roll, GA 24 – 0.701mm x 2.44m l.m.               188.39
Ordinary Ridge Roll, GA 24 – 0.701mm x 2.44m l.m.               119.40
Roof Ventilators set            1,360.89

These prices are calculated using cost-averaging formula. Some locations’ costs may be more expensive compared to the other. We simplified it this way for easy price updating.

To see all the material prices we have posted click here.

Please let us know how this blog helped you by subscribing, hitting like or share

Mindanao Earthworks and Embankment Prices

MATERIAL DESCRIPTION UNIT  AMOUNT (Php)
EMBANKMENT
Borrow Pit cu.m.          378.34
Mixed Sand & Gravel cu.m.          594.93
Rock cu.m.          671.31
AGGREGATE SUBBASE MATERIALS
Aggregate Subbase Course Material cu.m.          614.52
AGGREGATE BASE COURSE
Crushed Aggregate Base Course cu.m.          711.77
Uncrushed Aggregate Base Course cu.m.          654.30
Blended Weathered Limestone and Crush Stone cu.m.          715.86
Filler Material cu.m.          642.10
LIME STABILIZED ROAD MIXED BASE COURSE
Crushed Lime Stabilized Mix Aggregate Base Course cu.m.          727.06
Uncrushed Lime Stabilized Mix Aggregate Base Course cu.m.          690.95
AGGREGATE SURFACE COURSE
Crushed Aggregate Surface Course cu.m.          714.27
Uncrushed Aggregate Surface Course cu.m.          682.36
BITUMINOUS SURFACE TREATMENT
Crushed Stone Surface Treatment cu.m.          759.71
Crushed Slag  Surface Treatment cu.m.          740.69
Crushed Gravel Surface Treatment cu.m.          728.99

These prices are calculated using cost-averaging formula. Some locations’ costs may be more expensive compared to the other. We simplified it this way for easy price updating.

To see all the material prices we have posted click here.

Please let us know how this blog helped you by subscribing, hitting like or share!

Visayas Earthworks and Embankment Prices

MATERIAL DESCRIPTION UNIT  AMOUNT (Php)
EMBANKMENT
Borrow Pit cu.m.          391.17
Mixed Sand & Gravel cu.m.          538.28
Rock cu.m.          676.93
AGGREGATE SUBBASE MATERIALS
Aggregate Subbase Course Material cu.m.          614.52
AGGREGATE BASE COURSE
Crushed Aggregate Base Course cu.m.          710.02
Uncrushed Aggregate Base Course cu.m.          665.59
Blended Weathered Limestone and Crush Stone cu.m.          703.96
Filler Material cu.m.          684.51
LIME STABILIZED ROAD MIXED BASE COURSE
Crushed Lime Stabilized Mix Aggregate Base Course cu.m.          694.50
Uncrushed Lime Stabilized Mix Aggregate Base Course cu.m.          650.44
AGGREGATE SURFACE COURSE
Crushed Aggregate Surface Course cu.m.          658.36
Uncrushed Aggregate Surface Course cu.m.          621.58
BITUMINOUS SURFACE TREATMENT
Crushed Stone Surface Treatment cu.m.          731.89
Crushed Slag  Surface Treatment cu.m.          741.59
Crushed Gravel Surface Treatment cu.m.          712.33

These prices are calculated using cost-averaging formula. Some locations’ costs may be more expensive compared to the other. We simplified it this way for easy price updating.

To see all the material prices we have posted click here.

Please let us know how this blog helped you by subscribing, hitting like or share!

Luzon Earthworks and Embankment Prices

EMBANKMENT
Borrow Pit cu.m.        340.39
Mixed Sand & Gravel cu.m.        420.14
Rock cu.m.        544.67
AGGREGATE SUBBASE MATERIALS
Aggregate Subbase Course Material cu.m.        517.98
AGGREGATE BASE COURSE
Crushed Aggregate Base Course cu.m.        630.38
Uncrushed Aggregate Base Course cu.m.        566.63
Blended Weathered Limestone and Crush Stone cu.m.        581.94
Filler Material cu.m.        483.99
LIME STABILIZED ROAD MIXED BASE COURSE
Crushed Lime Stabilized Mix Aggregate Base Course cu.m.        668.17
Uncrushed Lime Stabilized Mix Aggregate Base Course cu.m.        623.25
AGGREGATE SURFACE COURSE
Crushed Aggregate Surface Course cu.m.        709.36
Uncrushed Aggregate Surface Course cu.m.        618.76
BITUMINOUS SURFACE TREATMENT
Crushed Stone Surface Treatment cu.m.        704.20
Crushed Slag  Surface Treatment cu.m.        701.99
Crushed Gravel Surface Treatment cu.m.        687.15

These prices are calculated using cost-averaging formula. Some locations’ costs may be more expensive compared to the other. We simplified it this way for easy price updating.

To see all the material prices we have posted click here.

Please let us know how this blog helped you by subscribing, hitting like or share!

Open Basketball Court Construction Price Guide

EARTHWORKS
WORK ITEM DESCRIPTION UNIT  QUANTITY   Unit Price Total Amount
Earthworks
To isolated footing cu.m.                1.22             444.60                 542.41
Backfill and Compaction
To isolated footing cu.m.                4.15             421.20              1,747.98
Hauling and Disposal
To isolated footing cu.m.                2.65             397.80              1,054.17
Gravel Fill
100mm thick gravel bedding to isolated footing cu.m.                0.95         1,764.50              1,676.28
>>>   Sub – Total              5,020.84
CONCRETE FORMWORKS AND ACCESSORIES
WORK ITEM DESCRIPTION UNIT  QUANTITY   Unit Price Total Amount
Structural Cast-in-Place Forms
To isolated footing sq.m.                5.20             660.50              3,434.60
To column sq.m.                6.32             660.50              4,174.36
Concrete Reinforcement Steel – Grade 40
To footing
12mm dia kg              92.09               60.50              5,571.74
To column
12mm dia kg              22.76               60.50              1,376.80
10mm dia kg                5.93               60.50                 358.54
9mm dia kg                6.60               60.50                 399.33
Cast in Place Concrete – Structural Concrete
3,000 PSI
To footing cu.m.                1.70         5,490.40              9,333.68
To column cu.m.                0.54         5,490.40              2,964.82
BASKETBALL COURT ( 16M X 30M X 0.15M THK)
Gravel Bedding (consider 0.15m thk  with 95% compacted) cu.m.              77.00         1,900.00          146,300.00
Concrete (0.15m thick, w/ 2500 psi) cu.m.              72.00         4,920.00          354,240.00
Forms (on sidings) consider: L=92m sq.m.              13.80             650.00              8,970.00
Contraction joint saw-cut groove  with sealant to SOG m              32.00             240.00              7,680.00
Plain Cement Finish sq.m.           480.00             497.25          238,680.00
Reinforcing Bars
10 mm Ø kgs        1,856.28               60.11          111,571.71
16 mm Ø kgs              28.44               60.11              1,709.39
>>>   Sub – Total          896,764.96
FINISHES
Exterior Painting UNIT  QUANTITY   Unit Price Total Amount
To basketball court lines sq.m.              15.22             456.30              6,944.43
To basketball court flooring (Epoxy Painting) sq.m.           448.00             456.30          204,422.40
>>>   Sub – Total          211,366.83
SPECIAL CONSTRUCTION
WORK ITEM DESCRIPTION UNIT  QUANTITY   Unit Price Total Amount
Basketball Stand with Ring set                2.00       17,550.00            35,100.00
>>>   Sub – Total            35,100.00
>>>  GRAND TOTAL       1,148,252.63

VAT not included.

Average construction timeline around 1-3 months.

To see all the material prices we have posted click here.

Please let us know how this blog helped you by subscribing, hitting like or share!

Cabinets and Countertop Price Guide

Description UOM  Amount (PhP)
Kitchen 18mm thk Laminated MDF Overhead Cabinets with Concealed Hinges (3.1 sq.m.) unit          49,450.00
Kitchen Cabinet with 18mm thk Granite Counter Top – Laminated MDF (2.4 sq.m.) unit          95,450.00
Fixed Closet Cabinet w/ Open Type Cabinet Shelves – Laminated MDF (2.30m H x 0.6m W x 1.65m L) unit          36,604.00
Fixed Closet Cabinet  – Laminated MDF (2.3m H x 0.6m W x 1.3m L) unit          31,280.00
Lavatory w/ Granite Countertop (0.85m H x 0.60m W  x 0.7m L) unit          16,560.00
Laminated MDF Cabinet w/ granite Countertop (0.85m H x 0.60m W  x 0.6m L) unit          12,880.00

VAT not included.

To see all the material prices we have posted click here.

Please let us know how this blog helped you by subscribing, hitting like or share!

Timber and Metal Formworks and Scaffolds Materials Price List

Timber and Metal Formworks and Scaffolds Materials Prices
Description Unit Price (PhP)
Concrete Nails kg             99.33
Common Nails kg             69.18
Concrete Form Oil ltr             44.30
GI Sheet Plain Gauge 16 x 8′ (1.613mm thk) pc        1,580.34
GI Sheet Plain Gauge 20 x 8′ (1.006mm thk) pc        1,110.27
GI Sheet Plain Gauge 26 x 8′ (0.551mm thk) pc           512.96
GI Pipe Schedule 40 – Dia 19mm pc           487.58
GI Pipe Schedule 40 – Dia 25.4mm pc           775.83
GI Pipe Schedule 40 – Dia 38mm pc        1,193.39
GI Pipe Schedule 40 – Dia 50.8mm pc        1,636.40
GI Pipe Schedule 40 – Dia 76mm pc        2,810.28
GI Pipe Schedule 40 – Dia 102mm pc        4,318.04
GI Pipe Schedule 40 – Dia 127mm pc        7,442.72
GI Pipe Schedule 40 – Dia 152mm pc        8,238.07
Coco Lumber bdft             20.39
Good Lumber bdft             48.48
Milled Steel Plates Checked FY36 kg             52.55
Milled Steel Plates FY36 kg             51.01
Plyboard (0.019m x 1.2m x 2.44m) pc           930.88
Plyboard (0.025m x 1.2m x 2.44m) pc        1,095.54
Plywood Marine (0.00625m x 1.2m x 2.44m) pc           408.46
Plywood Marine (0.0125m x 1.2m x 2.44m) pc           770.41
Plywood Marine (0.019m x 1.2m x 2.44m) pc        1,227.02
Plywood Ordinary (0.0065m x 1.4 x 2.44m) pc           357.59
Plywood Ordinary (0.0125m x 1.4 x 2.44m) pc           651.18
Plywood Ordinary (0.019m x 1.4 x 2.44m) pc        1,047.29
Steel Deck sqm           841.93

VAT not included.

To see all the material prices we have posted click here.

Please let us know how this blog helped you by subscribing, hitting like or share!

Site Office Supply Price Guide

Site Office Supply Materials Prices
Description Amount (Php) Unit
 A4 Folder, 50 pieces per bundle 233.86 bundle
Legal Size Folder, 50 pieces per bundle 292.33 bundle
L-type, A4 Size Folder, 50 pieces per pack 169.95 pack
L-type, Legal Size Folder, 50 pieces per pack 179.65 pack
Pressboard Folder, size: 240mm x 370mm, 100 pieces per box 763.23 box
Tagboard Folder (A4), 100 pieces per pack 184.30 pack
Tagboard Folder (Legal), 100 pieces per pack 204.80 pack
All-Purpose Glue (200ml) 45.16 jars
Heavy Duty Paper Puncher 116.80 piece
300 Leaves Record Book, size: 214mm x 278mm 60.33 book
500 Leaves Record Book, size: 214mm x 278mm min 86.63 book
#18 Rubber Band 95.37 box
Plastic Ruler 15.82 piece
Scissors 14.03 pair
Scouring Pad, 5 pieces per pack 121.05 pack
Liquid/Gel-inked Sign Pen (Blue, Black Red) 0.5mm Point 38.94 piece
Stamped Pad Ink, 50ml (min.) 25.17 bottle
Stamp Pad (60mm x 100mm) 31.76 piece
Plier Type Staple Remover 18.58 piece
Heavy Duty Staple Wire 23.92 box
Standard Staple Wire 19.34 box
Standard Type Stapler 90.23 piece
Table Top Tape Dispenser 48.77 piece
Electrical Tape 18.60 roll
Masking Tape, width: 24mm 56.21 roll
Masking Tape width: 48mm 105.02 roll
Packaging Tape, width: 48mm 31.31 roll
Standard Tape, width: 24mm 17.75 roll
Standard Tape, width: 48mm 27.11 roll
Standard Mongol Pencil, 12 dozens per box 74.43 box
Sharpener for Pencil 191.34 piece
Ruled Pad Paper 18.39 pad
32mm Paper Clip, 100 pieces per box 6.91 box
48mm Paper Clip, 100 pieces per box 13.82 box
Manual Paper Shredder 350.00 unit
Paper Shredder 5612.64 unit
A4 Paper, 80gsm, size: 210mm x 297mm 91.95 ream
Legal Paper, 80gsm, size: 216mm x 330mm 105.24 ream
Metal Fastener, 50 sets per box 56.15 box
Legal Sized File Organizer 72.23 piece
Permanent Marker (Red, Blue, Black) 9.55 piece
Whiteboard Marker (Red, Blue, Black) 10.50 piece
Blackboard/Whiteboard Eraser 11.35 piece
Scientific Calculator 770.68 unit
A4 Sized Envelope, 500 pieces per box 384.72 box
Legal Sized Envelope 500 pieces per box 497.20 box
Mailing Envelope, 500 pieces per box 134.87 box
Mailing Envelope w/ Window, 500 pieces per box 172.72 box

VAT not included.

To see all the material prices we have posted click here.

Please let us know how this blog helped you by subscribing, hitting like or share!

https://www.googletagmanager.com/gtag/js?id=UA-146841859-1