Typical Two Story House (or Condominium) – Punchlist Key Points

$2.00

Know what key points to check and inspect during your newly purchased house! 

Quality Control Architects and Engineers use this house inspection checklist when inspecting the ongoing construction and final output of a house.

It would truly be best to hire a professional during final inspection. In case you can’t hire, this checklist will definitely help you out!

This is for a typical two-story house (NOT all are applicable to a condominium unit, just look for the key point you want to inspect in the list).

What’s Inside? 42 inspection points PDF (or word) file of the typical punchlist key points to inspect in a newly built (and about to build) homes!

Email us at philconprices@gmail.com when you encountered a problem.

 

Description

Know what key points to check and inspect during final inspection of your newly purchased house! 

Quality Control Architects and Engineers use this house inspection checklist when inspecting the ongoing construction and final output of a house.

It would truly be best to hire a professional during final inspection. In case you can’t hire one, this checklist will definitely help you out!

This is for a typical two-story house (NOT all are applicable to a condominium unit, just look for the key point you want to inspect in the list).

 

Email us at philconprices@gmail.com when you encountered a problem.

 

What’s inside?

Inspection Checklist in Word and PDF Files of the following:

 

Architectural Works:

1.) Concrete Canopy – Ledge Finishing Works

2.) Door Installation and Finishing Works

3.) Engineered Wood Flooring Installation

4.) Fascia Board, Gutter, Ceiling Eaves and Downspout Installation and Finishing Works

5.) Foyer Stair and Landing Finishing Works

6.) Glass Canopy Installation

7.) Interior, Exterior, Ceiling and Ceiling Eaves Painting Works

8.) Kitchen Counter Top Installation and Finishing Works

9.) Metal Framing and Ceiling Works

10.) Service Counter Construction and Finishing Works

11.) Stair and Landing Finishing Works

12.) Tiling Works Finishing Works

13.) Tiling Works and Glass Installation of Balcony (Master’s Bedroom or where applicable)

14.) Wardrobe Installation and Finishing Works

15.) Window Installation

16.) ACCU Enclosure Installation and Finishing Works

17.) Shower Enclosure Installation and Finishing Works

18.) T&B Tiling, Fixtures Installation and Functional Works

 

Civil Works: 

19.) Staking and Layout

 

Electrical Works:

20.) Grounding System Functional Works

21.) Service Entrance Installation Works

 

Foundation Works:

22.)  Backfilling of Retaining Wall

23.) (Open) Car Garage Construction Works

24.) Foyer Stair Construction

25.) Lanai Construction

26.) Retaining Wall Construction

27.) Retaining Wall Footing Construction

28.) (Open) Service Area Construction

 

Roof Installation:

29.) Roof Installation and Framing

 

Structural Works:

30.) 2F Roof Beam Construction

31.) 2F (including ground) Walls and Partition Construction

32.) Canopy-Ledge Construction

33.) Column Construction

34.) Concrete Stair and Landing Construction

35.) Girder Beam Construction

36.) Lintel Beam Construction

37.) Retaining Wall Construction

38.) Slab on Grade Construction

39.) Perimeter Wall Construction

 

Underground Works:

40.) Catch Basin Construction

41.) Rainwater Tank Construction

42.) Septic Tank Construction

 

Reviews

There are no reviews yet.

Be the first to review “Typical Two Story House (or Condominium) – Punchlist Key Points”

https://www.googletagmanager.com/gtag/js?id=UA-146841859-1